03-23-2015, 11:05 PM
Not available to public!
Channel access restricted to trusted BDM staff only.
Channel access restricted to trusted BDM staff only.
VALKNUT NEURAL NETWORK SCHATTEN PROJECT ARCHIVE |
CONNECTION ESTABLISHED |
CONSOLE STATUS STANDBY |
PROFILE ********* |
Project Index:
▌Crew Assignment - 4 Crew teams issued to "The-Zealous" (40 people)
▌Metastability design 1 - Ship supercomputer designs in progress, requesting approval
▌Pre-Modification Analysis - Zealous analysis pre-modifications taken place at 03-26-2015, ship electronics, navigation, infrastructure, tactical.
▌HTTB Type-1 Schematics - High-Temperature Thorium Breeder schematics obtained, high powered variant planned to be installed.
▌Metastability design 2 - Supercomputer design finalised and approved, requesting components for delivery.
▌Metastability Construction - Supercomputer construction is underway, planned to regulate all ship systems.
▌OPTRA obtained - Lane hackers have provided schematics to an advanced electronics array, Omni-Purpose Transceiver and Radar Array
▌Pre-Modification Analysis - Ship wide Analysis taken place at 02-24-2016
▌HTTB Type-1, HNP-E3PS installation - HTTB Type-1 power reactor, HNP-E3PS Hybrid Nuclear pulse engine installed onto the vessel
▌HTTB Type-1, HNP-E3PS Testing - HTTB Type-1 power reactor, HNP-E3PS Test results detailed
▌Ghost Veil: Pre-Development Modifications - Detailing experimental
▌Power management and regulation systems - New power management and regulation systems installed, similar to heavy warship classification
▌Expanded Cryo-Cooling facility - Cooling facilities installed, capable of handling increased cooling demand of electronics and power generators
▌Ghost Veil: Vapour chamber coolers - Part of the stealth development project: Vapour chambers designed to cool expended engine gasses.
▌Ghost Veil: Radar Absorbent Material - Part of the stealth development project: Passive hull and structure designs to reduce electronic detection.
▌Structure vitality and integrity overhaul - Structure and hull upgrades to ensure that the vessel is upgraded to warship standards of its size.
▌Hyperspace Survey package - Upgraded array to penetrate hyperspace and obtain space-time co-ordinates.
▌Project Luckeweltraum - Archived File, Project Luckeweltraum.
▌Project Luckeweltraum: Overview 1 - Introduction to Project Luckeweltraum, a system capable of entering slip-space for FTL on-demand travel.
▌Cultist file: Secured server - A Captured data server from the cultists containing encrypted information
▌Project Luckeweltraum: Overview 2 - Study on event horizons and Jumphole theoretical sciences.
▌Project Luckeweltraum: Overview 3 - Manipulation of Graviton energy, Jumphole "Phase-Aligned" theory
▌Cultist file: Secured server - Weapon system schematics obtained, Twin Gatling Laser, EMP Dispersion field
▌EVSM - Environmental & Visual Scanning Matrix, originally part of project Ghost Veil
▌Project Luckeweltraum: Technical Review - Graviton emitter placement and ship structure manipulation.
▌Spyglass Array - Modified spyglass array installed, acquisition from Lane Hacker trade-over.
▌Crew Assignment - 4 Crew teams issued to "The-Zealous" (40 people)
▌Metastability design 1 - Ship supercomputer designs in progress, requesting approval
▌Pre-Modification Analysis - Zealous analysis pre-modifications taken place at 03-26-2015, ship electronics, navigation, infrastructure, tactical.
▌HTTB Type-1 Schematics - High-Temperature Thorium Breeder schematics obtained, high powered variant planned to be installed.
▌Metastability design 2 - Supercomputer design finalised and approved, requesting components for delivery.
▌Metastability Construction - Supercomputer construction is underway, planned to regulate all ship systems.
▌OPTRA obtained - Lane hackers have provided schematics to an advanced electronics array, Omni-Purpose Transceiver and Radar Array
▌Pre-Modification Analysis - Ship wide Analysis taken place at 02-24-2016
▌HTTB Type-1, HNP-E3PS installation - HTTB Type-1 power reactor, HNP-E3PS Hybrid Nuclear pulse engine installed onto the vessel
▌HTTB Type-1, HNP-E3PS Testing - HTTB Type-1 power reactor, HNP-E3PS Test results detailed
▌Ghost Veil: Pre-Development Modifications - Detailing experimental
▌Power management and regulation systems - New power management and regulation systems installed, similar to heavy warship classification
▌Expanded Cryo-Cooling facility - Cooling facilities installed, capable of handling increased cooling demand of electronics and power generators
▌Ghost Veil: Vapour chamber coolers - Part of the stealth development project: Vapour chambers designed to cool expended engine gasses.
▌Ghost Veil: Radar Absorbent Material - Part of the stealth development project: Passive hull and structure designs to reduce electronic detection.
▌Structure vitality and integrity overhaul - Structure and hull upgrades to ensure that the vessel is upgraded to warship standards of its size.
▌Hyperspace Survey package - Upgraded array to penetrate hyperspace and obtain space-time co-ordinates.
▌Project Luckeweltraum - Archived File, Project Luckeweltraum.
▌Project Luckeweltraum: Overview 1 - Introduction to Project Luckeweltraum, a system capable of entering slip-space for FTL on-demand travel.
▌Cultist file: Secured server - A Captured data server from the cultists containing encrypted information
▌Project Luckeweltraum: Overview 2 - Study on event horizons and Jumphole theoretical sciences.
▌Project Luckeweltraum: Overview 3 - Manipulation of Graviton energy, Jumphole "Phase-Aligned" theory
▌Cultist file: Secured server - Weapon system schematics obtained, Twin Gatling Laser, EMP Dispersion field
▌EVSM - Environmental & Visual Scanning Matrix, originally part of project Ghost Veil
▌Project Luckeweltraum: Technical Review - Graviton emitter placement and ship structure manipulation.
▌Spyglass Array - Modified spyglass array installed, acquisition from Lane Hacker trade-over.
PROJECT SPECTRE | >: INCOMING MESSAGE... To: The Engineers and employees assigned to work amongst our grand design. Both me and Enfield are highly appreciative that you have chosen or been chosen to work on our "The-Zealous", this project will be long term and many of you will become full time engineers assigned to the test ship, you will learn from new experience from a range of technologies, both human and alien. Should you feel you will not be up to the courageous job, please consult to your nearest supervisor and/or commander. The work will mostly be stationed at Schatten for multiple short time periods when equipment is being installed, but should you join the journey into where this ship is required or has chosen to go, then remember, you are part of the limited crew that has Chosen & Accepted the terms to join us. You will be both required to be trained in both mental & Physical conditioning, should you not have already had this training, you will receive it before hand while any of the first stage modifications take place. With high hopes: "Zealous" Epsilon-101 >: END OF MESSAGE >: |
"The-Zealous" ||| Test rig / Spy ship Project.
[TOP SECRET! / Streng Geheim!]
This project will focus on the ship codenamed "The-Zealous", is planned to be one of the largest non-combat spy ship and equipment test rig ever put in service for the Büro der Marineintelligenz. Lead by employee Geoffrey Enfield and "Zealous" Epsilon-101, supported by Direktor Volker Koch, This ship will be used by the Buro extensively in multiple situations, from relations to spy missions.
Various equipment that will need testing on a live platform, such as the prototype engine and power plant from Project "Goliath", will be first constructed and tested on this ship before its officially used in the heat of battle against the enemies of the Buro and state of Rheinland and its allies.
INCOMING MESSAGE | SCHATTEN INTERNAL NETWORK
To: The Engineers and employees assigned to work amongst our grand design.
Both me and Enfield are highly appreciative that you have chosen or been chosen to work on our "The-Zealous", this project will be long term and many of you will become full time engineers assigned to the test ship, you will learn from new experience from a range of technologies, both human and alien. Should you feel you will not be up to the courageous job, please consult to your nearest supervisor and/or commander.
The work will mostly be stationed at Schatten for multiple short time periods when equipment is being installed, but should you join the journey into where this ship is required or has chosen to go, then remember, you are part of the limited crew that has Chosen & Accepted the terms to join us.
You will be both required to be trained in both mental & Physical conditioning, should you not have already had this training, you will receive it before hand while any of the first stage modifications take place.
The work will mostly be stationed at Schatten for multiple short time periods when equipment is being installed, but should you join the journey into where this ship is required or has chosen to go, then remember, you are part of the limited crew that has Chosen & Accepted the terms to join us.
You will be both required to be trained in both mental & Physical conditioning, should you not have already had this training, you will receive it before hand while any of the first stage modifications take place.
With high hopes:
"Zealous" Epsilon-101
END OF MESSAGE