Discovery Gaming Community
Omicron Supply Industries Maintenance File #8792 - 'Rob's Repairs' - Printable Version

+- Discovery Gaming Community (https://discoverygc.com/forums)
+-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9)
+--- Forum: Stories and Biographies (https://discoverygc.com/forums/forumdisplay.php?fid=56)
+--- Thread: Omicron Supply Industries Maintenance File #8792 - 'Rob's Repairs' (/showthread.php?tid=166483)



Omicron Supply Industries Maintenance File #8792 - 'Rob's Repairs' - Stoner_Steve - 12-10-2018


[img float=left]https://i.imgur.com/sxJcDjw.jpg?1[/img]
-- Start File --
-- start feed --
* ID: Rob Ross - Chief Engineer, Third Shift
* Location: Nichols Trade Center, Omega 49
* Date: 9/12/825 - 00:57
* Work Order: H-28997
Signal coding complete
Message Beginning:


\Downloading Photo/
[Image: CPysAZn.jpg?1]

\Start Playback/

"...Today me an' Bill worked on that second intake manifold on that Pilgrim Liner moored down in bay three. With any luck the next shift will be able to pick up the diagnostic report to see if that was all she needed." he scratched at his chin for a moment before continuing on. "Also met one of the new patrolling Officers from the Sterling right over there. Calls herself Lilly Holt, and a right darn opinion about everything going on in 49. Course can't expect much from them military folk. No doubt we'll be seeing more of her in these coming days." he sniffed loudly and scratched at his chest before continuing on "I plan to start early next rotation on that weapons mounting for the yacht in bay one should be an easy bit of work before looking in on that Pilgrim's work order report from first shift."


\End Playback/

End File
-- feed terminated --
-- Secondary data log saved --





RE: Omicron Supply Industries Maintenance File #8792 - 'Rob's Repairs' - Stoner_Steve - 12-11-2018


[img float=left]https://i.imgur.com/sxJcDjw.jpg?1[/img]
-- Start File --
-- start feed --
* ID: Rob Ross - Chief Engineer, Third Shift
* Location: Nichols Trade Center, Omega 49
* Date: 10/12/825 - 02:52
* Work Order: H-28999
Signal coding complete
Message Beginning:


\Downloading Photo/
[Image: NP21W7U.jpg?1]

\Start Playback/

"The glass needed a good going over to scour for micrometeorite damage. Nano-repair bots were used when needed." holding his hand up for a moment to cover his mouth while he yawned. "excuse me; managed to squeeze a bit of work on that weapon plasma coupling on the yacht in bay one. honestly I don't know what else he expects we can't exactly hook the drive reactors in directly." snorting slightly as he inhailed he continued on. "I've got first shift penned in to get back to work on that intake manifold on the Pilgrim in bay three, I'll pick up where they leave off tomorrow."


\End Playback/

End File
-- feed terminated --
-- Secondary data log saved --





RE: Omicron Supply Industries Maintenance File #8792 - 'Rob's Repairs' - Stoner_Steve - 12-16-2018


[img float=left]https://i.imgur.com/sxJcDjw.jpg?1[/img]
-- Start File --
-- start feed --
* ID: Rob Ross - Chief Engineer, Third Shift
* Location: Grand Vista Orbital, Omega 49
* Date: 15/12/825 - 01:56
* Work Order: H-29000
Signal coding complete
Message Beginning:


\Downloading Photo/
[Image: iO3CIG3.jpg?1]

\Start Playback/

"I don't mind much when I get call-outs to other stations besides Nichols. And better yet this repair was a real head scratcher. The number 2 bay door was leaking air." he grinned slightly. "nothing dramatic mind you, but enough to ensure that the computer won't green-light the inner airlock to open." he itched slightly at his nose before continuing. "course we found that someone must have slammed a little to hard into the outer door. It was misaligned by only a few centimeters so I gently love-tapped it back into place. The airlock currently is cycling correctly and I've told the dock-master to send me a comm if they run into any further issues."


\End Playback/

End File
-- feed terminated --
-- Secondary data log saved --