Discovery Gaming Community
Project "Icebreaker" - Printable Version

+- Discovery Gaming Community (https://discoverygc.com/forums)
+-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9)
+--- Forum: Official Player Factions (https://discoverygc.com/forums/forumdisplay.php?fid=60)
+---- Forum: Edge Worlds (https://discoverygc.com/forums/forumdisplay.php?fid=72)
+----- Forum: Sirius Coalition (https://discoverygc.com/forums/forumdisplay.php?fid=461)
+------ Forum: Archive (https://discoverygc.com/forums/forumdisplay.php?fid=473)
+------ Thread: Project "Icebreaker" (/showthread.php?tid=168597)



Project "Icebreaker" - SCEC - 03-11-2019



[Image: 9p8Qe3i.png]


For internal use only. Unauthorised access restricted.


ENGINEERING TASK
to set experimental manufacture line for
battlecruiser "Breaker" turret

Project's Orderer: Sirius Coalition Expeditionary Corps
Project's Executor: Sirius Coalition Expeditionary Corps Engineering Division
Project's Logistic: Volgograd Industrial

DOCUMENTATION Analysis of combat data from CPW-Kronshtadt. Demonstrated advantages over standard Cerberus turrets. Higher density and stability of projectile body provide significant range enchancement, but require longer charge's time. Comparable with primary turret range allow more tactical patterns.
[Image: gGkOn9R.gif]
Weapon combat specifications
NameRangeMuzzle speedRPS
Breaker27508000.67

MANUFACTURING QUEUE Ships, considered for rearmament:
  • CPW "Kardashev"
  • CPW "Stepan Razin"
  • CPW "Coalition"
  • CPW "Priozersk"
  • [CLASSIFIED]
  • [CLASSIFIED]
Total serie quantity - 12 turrets.

ADDITIONAL RESOURCES

12.000 of superconductors.

Higher requirements to magnetic flux density along with saving same reliability as standard outfitting, force us to use advanced superconductors, not manufactured on Volgograd. Without it, heavier cooling systems will be required, to avoid quench. Maintenance cost would rise drastically.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.





RE: Project "Icebreaker" - SCEC - 03-17-2019



For internal use only. Unauthorised access restricted.


STATUS UPDATE

Required components delivered to Mykolaiv Research Station.
Experimental manufacturing line set in work.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.





RE: Project "Icebreaker" - SCEC - 03-28-2019



For internal use only. Unauthorised access restricted.


STATUS UPDATE

Turrets from first serie installed on ships [1],[2].
Manufacture line pending until further orders.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.





RE: Project "Icebreaker" - SCEC - 02-07-2020



For internal use only. Unauthorised access restricted.


MANUFACTURING QUEUE Ships, requesting rearmament:
  • CPW "Shlisselburg"
Total quantity - 2 turrets.

ADDITIONAL RESOURCES

2.000 of superconductors.

STATUS

Materials arrived. Turrets produced and installed.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.