Discovery Gaming Community
Durham Production Facility Construction Site - Printable Version

+- Discovery Gaming Community (https://discoverygc.com/forums)
+-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9)
+--- Forum: Player Owned Bases (https://discoverygc.com/forums/forumdisplay.php?fid=61)
+--- Thread: Durham Production Facility Construction Site (/showthread.php?tid=173782)



Durham Production Facility Construction Site - BMF - 09-27-2019

[Image: 0gSlFb3.gif]
Bretonia Mining and Fabrication
Redcarr Production Facility

Bretonia Mining and Fabrication, is well known to be one of the prime constructors, prodducers and gold ore distributors in Sirius.

Since it's foundation, that Isle of Skye has been a pinnacle of Bretonian Industry and will continue to serve as one of the most reliable stations in Sirius.

In Bretonias darkest hour, it was time to begin a new chapter in Bretonia Mining and Fabrication history.
To better fulfill our role, we now start the construction project of our own Production Facility, thus supplying our new needs.
The fact that planet Middlesbrough still has valuable minerals made us chose the location of the Destroyed Belfast Production Facility.

Belfast Production Facility was built by BMM 726 AS to refine for minerals mined on planet Middlesbrough before shipping them out of system. The base suffered some casualties in the wake of the Founders Day Revolt, but unlike at Graves Station, the station security on Belfast was able to lock the station down and wait for the Bretonian Police Authority, and BMM stayed in control of the station.

Molly sentiments remained high among the Belfast workforce and the Middlesbrough miners for decades due to ongoing tight police presence on the station. In late 814, while BAF forces were concentrating on the Kusari Front in the Taus, the Mollies attacked the station with a force of improvised Gunboats and a large portion of their fighter craft. The Mollies quickly took control of the station and ejected the captured BMM executives from the top airlock. After seizing the station, the Mollies modified its facilities to produce an improvement on the improvised capital ships they had used to capture the base.

During the invasion of Bretonia by Gallia, the Mollies fortified the station and built a defensive minefield to defend the station from Bretonian attacks. In late 825, having deemed that the Mollies would not be useful allies after the war was won, Gallia betrayed them by launching a surprise attack.

This new installation will be baptized Durham Production Facility.
Docking licences are hereby denied to any an all vessels with the exception of the Bretonian Authorities and contractors for unloading purposes only.

This installation will be using state of the art technology, developed through our research, can now use new faster ways of construction, our dearest and most renowned Scientists, leaded by our Chief Operation Manager Barba Negra, have developed this new way of 3D printing construction.

The construction site system is so versatile and fast we will be using it to 3D print the remaining of Durham Production Facility itself on the spot.

Through the focusing of electron charged particles we can now implement the actual printing of a complete Instalation in one third of the time it would take to build it piece by piece.
This new technology, comes with several advantages:

1- Safety of our customers
Although we have changed proprietary, BMF's quality standards remain as high as ever.
Our customers instalation designs, as well as their technological secrets, are assured by our simple process of base printing.
All is needed is a quick selection of the intended model class station, and the Printing Head will start the printing of the installation.

2- Ownership Warranty
Every single installation #D printed, must fitted with the communication components and Main Operating Systems by the contracteur of the installation

3- Reliability
The process of 3D printing a installation while not allowing any secrets to be disclosed, offers an unprecedented precision to the production of the installation.
Blue diamonds have a special role here as their colour produces a special frequency beam that allows the printer head to "know" which materials go where.

4- Speed
The study of the refractory qualities of diamonds within artificially created anomalies allows the effective separation of materials during the smelting process, allowing the precise 3D printing of different space station systems without the possibility of error.
The fact is that, as soon as schematics are "feed" to the Printer Head System, the 3D production process begins, we have effectively reduced the construction time of any given installation by its half.



Durham Production Facility Construction Project
Total Budget = 380.000 Units of Raw Materials

Stage 1: The Super Structure

Raw MaterialsBudget
CommodityTotal AmountTotal Remaining
Reinforced Alloy 40,000 Complete
Contracted to BMF Staff
Hull Segments40,000 Complete
Contracted toBMF Staff
High Performance Alloy40,000Complete
Contracted toBowex) https://discoverygc.com/forums/showthread.php?tid=174041


Stage 2: The Main Reactor & Life Support

Raw MaterialsBudget
CommodityTotal AmountTotal Remaining
Industrial Hardware 100,000 Complete
Contracted to BMF Staff
Robotic Hardware40,000 Complete
Contracted toBMF Staff
Optronic Arrays40,000Complete
Contracted toSamura https://discoverygc.com/forums/showthread.php?tid=174040


Stage 3: The Electrical & Primary Factory Systems

Raw MaterialsBudget
CommodityTotal AmountTotal Remaining
Heat Sinks 40,000 Complete
Contracted to BMF Staff
PlasFoam Conduits20,000 Complete
Contracted toBMF Staff
Nanomembrane Filters20,000 Complete
Contracted toBMF Staff

Stage 4: The Crew Living Quarters & Security Area

Raw MaterialsBudget
CommodityTotal AmountTotal Remaining
Armaments 30,000 30,000
Contracted to Bowex https://discoverygc.com/forums/showthread.php?tid=174041&pid=2115302#pid2115302
Quantum Arrays30,000 30,000
Contracted toBowex https://discoverygc.com/forums/showthread.php?tid=174041&pid=2115302#pid2115302
Optronic Arrays30,000 30,000
Contracted toSamurahttps://discoverygc.com/forums/showthread.php?tid=174040
Hull Segments30,000 Complete
Contracted toInterspace Commercehttps://discoverygc.com/forums/showthread.php?tid=174043
Robotic Hardware45,000 45,000
Contracted toUniversal Shipping Inc.https://discoverygc.com/forums/showthread.php?tid=174242
Industrial Hardware45,000 Complete
Contracted toBMF Staff

Stage 5: The Reserved Areas

Raw MaterialsBudget
CommodityTotal AmountTotal Remaining
BMF Fabrication AreaBMF Staff
Reinforced Alloy 40,000 Complete
High Performance Alloy40,000Complete
Industrial Hardware 100,000 Complete
Robotic Hardware40,000 Complete
Bowex) Production Area Bowex) Staffhttps://discoverygc.com/forums/showthread.php?tid=174412
Hull Segments40,000 Complete
Heat Sinks 40,000 Complete
PlasFoam Conduits20,000 Complete
Nanomembrane Filters20,000 Complete
Outsourced Components
Optronic Arrays40,000Complete
Contracted toSamura https://discoverygc.com/forums/showthread.php?tid=174411&pid=2117327#pid2117327



RE: Durham Production Facility Construction Site - BMF - 10-17-2019

[Image: 0gSlFb3.gif]
Bretonia Mining and Fabrication
Basic Infrastructure Installation Complete
(Stages: 1, 2 and 3)



RE: Durham Production Facility Construction Site - BMF - 10-27-2019

[Image: 0gSlFb3.gif]
Bretonia Mining and Fabrication
Corporate Instalations Complete
(Stages: 4 and 5)



RE: Durham Production Facility Construction Site - BMF - 01-11-2021

[Image: 0gSlFb3.gif]
Bretonia Mining and Fabrication
Installation renamed to Redcarr Production Facility
(Previous contracts remain valid, redaction unnecessary.)