Discovery Gaming Community
I.B.Bot Project - Printable Version

+- Discovery Gaming Community (https://discoverygc.com/forums)
+-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9)
+--- Forum: Stories and Biographies (https://discoverygc.com/forums/forumdisplay.php?fid=56)
+--- Thread: I.B.Bot Project (/showthread.php?tid=180017)



I.B.Bot Project - Meat32wi - 05-24-2020

[Image: hamct9E.gif]

Name: International Beacon Bot (shortly I.B.Bot)
Location: International Beacon in Pennsylvania, Near Philadelphia Station
Affliation: Zoners
Primary Objective: Base administration (Delivering supplies, information desk, Mining missions)

Description: "At first, it was developed as a neural network for solving basic administrative tasks.

Over time, it absorbed more and more information and, subsequently, reached the intellectual level of a person. Maybe it did not understand feelings and emotions, however it could operate the ship, so the administration ordered to give it a ship for the supplies delivery to the base and mining missions.

The programmer who wrote the neural network assures that this should not have happened, that a mistake was made in the program, because of which it began to analyze more information than needed. In this way, it has technically "evolved".

For meetings, it uses a special mechanical "body"
(see the picture above), because of which it can be on the other side of the galaxy, but such bodies can not be active more than one at a time, since the connection would be too unstable."

Bot Construction: <CLASSIFIED BLUEPRINTS>
Ships in control:
  • Series YX "Dromedary" Border Worlds Freighter
  • DU5-7Y "Hegemon" Asteroid Miner





RE: I.B.Bot Project - Meat32wi - 06-06-2020

[Image: hamct9E.gif]

System Analysis [Image: SmoothDependableIzuthrush-max-1mb.gif]

//Power: ----> CHECK. WORKS STABILY.
//System Status: ----> CHECK. WORKS STABILY.
//Bodies Status: ----> CHECK. WORKS STABILY.
//Hegemon Ship Status: ----> CHECK. PARKED IN THE HANGAR. READY TO WORK.
//Dromedary Ship Status: ----> CHECK. PARKED IN THE HANGAR. READY TO WORK.
//Interstellar Beacon Base Status: ----> CHECK. REPAIRING IN PROGRESS.
//Incoming Data: ----> CHECK. ACCESSIBLE BELOW.
//New Information Available: ----> [Entry-level Medical Training Course]|[Interstellar Beacon Information]
//Summary Data: ----> ALL AVAILABLE INFORMATION IS PROCESSED. THE UNIT IS READY FOR THE FURTHER OPERATION.

System Analysis Complete




RE: I.B.Bot Project - Meat32wi - 06-09-2020

[Image: hamct9E.gif]

System Analysis [Image: SmoothDependableIzuthrush-max-1mb.gif]

//Power: ----> CHECK. WORKS STABILY.
//System Status: ----> CHECK. WORKS STABILY.
//Bodies Status: ----> CHECK. WORKS STABILY.
//Hegemon Ship Status: ----> CHECK. PARKED IN THE HANGAR. READY TO WORK.
//Dromedary Ship Status: ----> CHECK. PARKED IN THE HANGAR. REFUELING IN PROGRESS.
//Interstellar Beacon Base Status: ----> CHECK. REPAIRING IN PROGRESS.
//Incoming Data: ----> CHECK. ACCESSIBLE BELOW.
//New Information Available: ----> [Surveillance of Pennsylvania]
//Summary Data: ----> ALL AVAILABLE INFORMATION IS PROCESSED.

<TO CONTINUE THE REQUIRED FUNCTIONING, THE SYSTEM MUST BE UPDATED. PLEASE STAND BY>
//Autopening a developer's comment: ---->

/*For those who will work with this machine - try to allow as little software instability as possible. We don't want this piece of metal to stop working because someone was too lazy to do the necessary tests.
However instability can be debugged with the help of a machine, but I warn you this will take time and it will be easier to give the necessary amount of information. Enter "//Debugging and system configuration " without brackets to start the debugger and wait.*/


//Preparing to make a deep surveilance program: ----> CHECK. ALL SYSTEMS READY.
//Starting to make a solution to a specific task: ----> COMPLETE. THE METHOD MUST BE OPTIMIZED.
//Starting the Optimization Process: ----> ERROR! THE SYSTEM MUST HAVE OVER 10 EXAMPLES TO OPTIMIZE.
//Trying to reduce required examples: ----> WARNING! THE PROGRAM CAN BE UNSTABLE IN THIS CONFIGURATION!
//Starting the Optimization Process: ----> COMPLETE. THE TESTING IN PROGRESS.
//Debugging and system configuration: ----> STARTING. THE REQUIRED TIME IS 1 DAY.
<CLOSING UPDATER PROGRAM. DEBUGGING IN PROGRESS>


System Analysis Complete