Heus! The Core! I am Rob Serlax, Director of Mithranian Research Institute. I am sending this transmission to you with a request of constructing our installation into Omicron Delta system, near planet Tuvalu, opposite to Omicron-74 Jumphole.
The Installation would be a scientific station, while it would possess military strength for defensive purposes. We have no intentions in undermining your hold of Omicron Delta. Instead we would help you as well in your endeavours.
We hope to hear from you soon. If you have questions or doubts then send us a Transmission.
Signed by Rob Serlax, The Director.
*** Closing Transmission ***
*** Channels Closed ***
*** End of Transmission ***
Firstly, before we proceed with approving of the installation's construction I would like to know one small detail. You say you want to build the installation 'opposite' to the Omicron-74 Jumphole. Precisely, how close to that jump hole will the installation be?
-E. Nodtviet
Guildmaster, The Core
CEO, AP Manufacturing
Very well then. The placement of construction is sound. Allow me to bring up the Charter of Omicronia, so that you can be accquainted with our laws on Installation construction:
(01-25-2015, 02:47 PM)The Core Wrote: 7.0 - Installations 7.1 An installation may only be made in Omicron Delta, Omicron Zeta and Omicron Rho if The Core is asked for permission prior. Such installations need to be reviewed before creation, as they may impact Core operations for better or worse. Creation of an installation in Core territory will cost 10,000,000 Sirian Credits.
7.2 Depending on an installations Core level, it will be taxed monthly. The tax depends on the Core level:
• Core One bases will be taxed 15,000,000 credits per month • Core Two bases will be taxed 30,000,000 credits per month • Core Three bases will be taxed 45,000,000 credits per month • Core Four bases will be taxed 60,000,000 credits per month • Core Five bases will be taxed 75,000,000 credits per month
7.3 Base owners are required to keep the condition of their bases adequate for inspection checks that may be conducted without prior warning, and to ensure they are kept in line with Core laws.
7.4 Bases that are made without contacting The Core are illegal. Once an illegal installation has been found, if it is Core Level One it will be destroyed. If it is Core Level Two or higher, a transmission will be sent to its owner demanding a 100,000,000 fine. Failure to pay will result in termination of the installation.
If these terms are adequate for you, please wire 25,00,000 credits to Core|Bank.1 to cover the construction cost and the monthly tax. As it is currently the 31st, we will consider that payment to be the tax for next month.
Once you have done that everything will be complete and we will wish you the best with your installation. It will be kept under our watchful eye, and we will protect you and your installation from entities that may dare threaten your peace.
-E. Nodtviet
Guildmaster, The Core
CEO, AP Manufacturing
We thank you. One thing I noticed while reading your last reply, you stated there that we need to transfer 25.00.000 credits to given account. I think there was a typo. As if you include the first months tax with the initial fee, it would be 25.000.000 credits. Despite that, I will let my accountant to wire the needed funds when she returns to work in the morning. The constructions of the base would begin in the followings months first week. We will notify when the base is operational, Granting the docking rights as well.
We hope this small step is a stepping stone in improving our relations.
Signed by Rob Serlax, The Director.
*** Closing Transmission ***
*** Channels Closed ***
*** End of Transmission ***
My mistake. Thank you for taking the the initative and wiring the correct amount.
You have made a wise choice in coming to us regarding the legality of your station. You have given yourself a powerful ally - the strongest in the entire Omicrons - and we will see to it that your safety is secured.
If you ever require research materials, do not hesitate to contact us.
-E. Nodtviet
Guildmaster, The Core
CEO, AP Manufacturing
Heus! Mr.Erik Nodtviet. I was informed just minutes ago by my Accountant, she confirmed that the first initial sum of 25.000.000 Sirius Credits (twenty five millions in words) has been transferred successfully to the given account you've provided.
We will begin constructions on the Installation on the 5th. Estimated time of constructions will be 8 days, after that time, the installation will be ready to receive larger traffic.
Signed by Rob Serlax, The Director.
*** Closing Transmission ***
*** Channels Closed ***
*** End of Transmission ***
Excellent. We await patiently for when you build your installation. Please give us the name of the installation before you do though, so that we may amend it to our laws.
-E. Nodtviet
Guildmaster, The Core
CEO, AP Manufacturing
Heus! Mr. Nodtviet, the name of the installation will be „Installation Revelation“. Today we will be bringing the first shipments of materials to our constru...c....erm.. constructione team, who will be making their way to Omicron Delta with their vessel called |MRI|-BCP-Revelation. And will stay in Omicron Delta waiting for the last shipments until the Installation is done.
Sequentem Tempore...
Signed by Rob Serlax, The Director.
*** Closing Transmission ***
*** Channels Closed ***
*** End of Transmission ***
Heus Mr.Nodtviet! I am pleased to inform you that the construere of Installation Revelation was a huge success... It has been built, but our engineers still have a days work ahead of them before our installation could service more vessels, as our docking bays are still filled with materials that will be moved as soon as possible. Therefore I ask of your patience for one day, two at max. Before we can grant the rights and space for your vessels to dock with our Installation.
Signed by Rob Serlax, The Director.
*** Closing Transmission ***
*** Channels Closed ***
*** End of Transmission ***