-{@Incoming Data Packet Detected@}-
-{@Data Packet Standard Renzu Encryption@}-
-{@Message Begins@}-
CommID: Orlando Parda
Location: Parda and Partners
Hangar 23176 Manhattan Central Space Port
Planet Manhattan, New York-Liberty
Honorable Renzu Corporation:
I contact you today to request an estimate for additional work to be done on a late model Renzu Liner soon to come off of your production line. My client, who wishes to remain unknown, has some custom requirements needing filled before accepting the ship.
The ship itself and additional features such as Capital Armor Upgrade level 8, its military grade scanner and "Cheetah" class engine core have been paid for in advance.
The extra specifications needed to modify the Liner to my clients needs will require a fair amount of extra materials and commodities and labor. The Technical specs are all in the hands of the shipbuilders, but procuring the extra materials to complete the job has turned out to be slowing the project down.
My client wishes to have his ship as soon as possible. For this he is willing to pay an extra premium for faster delivery of the remaining materials needed to finalize construction on the "Paraiso Fiscal".
Aluminum
5000 units
Aluminum Ore
10000 units
Basic Alloy
10000 units
Beryllium
5000 units
Beryllium Ore
10000 units
Bio-Neural Processors
10000 units
Boron
10000 units
Cobalt
5000 units
Copper
5000 units
Copper Ore
5000 units
Gold
10000 units
Gold Ore
25000 units
High Temperature Alloy
7500 units
HoloSculptures
1500 units
Industrial Materials
20000 units
Iridium
2000 units
Luxury Consumer Goods
20000 units
Optical Chips
5000 units
Optronics
5000 units
Pearls
20000 units
Plastics
3 units
Platinum
5000 units
Platinum Ore
10000 units
Polymers
5000 units
Premium Scrap
1 unit
Quantum Multiplexors
5000 units
Robotic Components
10000 units
Ship Hull Panel
5000 units
Silver
5000 units
Silver Ore
10000 units
Super Alloy
7500 units
Superconductors
7500 units
Xenobiotic Filter
5000 units
As you can see, it is a tall order. One that may need many ships to complete. With this in mind, my client has set aside 100 million credits for you to use with extreme prejudice in any PR Blitz you may need to set up, to get this project done.
My client doesn't care if Renzu does this work in house or subcontracts the work out, but he does stipulate that all ships involved be Renzu built ships or ships owned by a filial or parent corporation. Proof of purchase and delivery of the items will also need to be made.
My personal analyst have informed me that this project could well run into the 500million range or more. Money is not the issue, my clients wishes and your reputation as ship builders are.
Please contact my offices on this channel, so as to better discuss what financial issues need arranged for this to get underway and my clients ship completed.
With kind regards,
Orlando Parda
Parda and Partners
Manhattan, New York
From: Shinji Takeda, Renzu Corporation To: Orlando Parda Re: Tall Order
Greetings,
Thank you for getting in touch. We have done some initial analysis of this order and have found that outsourcing this contract will produce faster results for you.
We will make the necessary arrangements and get back to you as soon as possible with a complete solution for your peace of mind.