New London Gate Construction Site

From Discovery Wiki
Revision as of 18:54, 20 November 2018 by Xiphos (talk | contribs) (Base infobox Name & Pic file fixed. Nickname, Exports & Imports added)
Jump to navigationJump to search
Warning.png
Article possibly outdated (
v4.90.2
)

This article has not been verified to be up to date for the latest version of the Discovery mod. The last edit was made on 20.11.2018 (DD/MM/YYYY). You may help by updating it, often by using the code generator.
New London Gate Construction Site
Cassien-Bernars class Station
New London Gate Construction Site.jpg
Owner
EFL Oil & Machinery
Location
3D, Leeds
Technical Data
Gravity CLASSIFIED
Docking bays CLASSIFIED
Amenities CLASSIFIED
Crew CLASSIFIED

Sponsored by the Gallic crown and given a priority over other projects, the newly begun EFL gate construction in Leeds is seen as a vital step towards securing the Bretonian front after the war. Intended to serve as the highway between Gallia and Bretonia once the war ends, the Gate is being rushed to prevent a halt in the Bretonian economy once the occupied government is put in place.

Optimistic estimates by EFL engineers predict that the Gate will be fully operational in the weeks after the final Gallic push into Bretonia, and just in time to allow for reinforcing elements to secure New London after the decisive battle that will take place over the capital planet within.

As with any successful occupation, the Gallic Crown has already begun planning how to rebuild the damaged infrastructure of Bretonia to allow for a quick revival of the soon to be conquered house under a puppet government.

Missions Offered


Bribes Offered


Commodities

Exports
Imports