Difference between revisions of "Sigma-19 Gate Construction Site"

From Discovery Wiki
Jump to navigationJump to search
m (Change 4.86 pages to 4.86Betas so that we have a clean V4.86 category upon final release., replaced: {{Version|4.86 → {{Version|4.86Betas)
Line 1: Line 1:
{{Version|4.86Betas}}{{Historical|Construction finished with v4.86, base was replaced with a working jump gate}}
+
{{Quote|<b>Note: This is a station that last existed in version 4.85.2 of the Discovery Freelancer mod and has now been removed. Below is a history of the station under [[DSE]] and the proceedings that occured from the beginning of the construction to the present day.</b>}}
[[File:Sigma19GateConstructionSite.png|thumb|right|180px|Former Tarawa class construction station]]
+
{{Base Infobox
 +
| name = Sigma-19 Gate Construction Site
 +
| image = Sigma19GateConstructionSite.png
 +
| class = Takawa
 +
| type = STATION
 +
| system = [[Okinawa]]
 +
| sector = 6G
 +
| house = [[Border Worlds]]
 +
| owner = [[Deep Space Engineering|DSE]]
 +
| gravity = Complete
 +
| docking = Yes
 +
| amenities = Yes
 +
| population = 675
 +
}}
 +
With construction of the jump gate having been underway for some time, the project is still expected to take a while longer to complete, especially given the strict directives to Deep Space Engineering, who are being paid a very handsome amount of money for their silence and speed in the construction project.
  
Despite a plethora of difficulties surrounding the construction of the [[Sigma-19]] Gate to [[Okinawa]], [[DSE]] has managed to complete the gate successfully. After thorough stability and stress tests the new tradelane leading from Planet Miura to the Sigma-19 gate as well as the gate itself have been completed, both were opened for public usage in a great ceremony on New Year's Eve.
+
Considerable amounts of supplies are constantly being shipped in to both the construction site and the nascent beginnings of a trade lane route to the planet [[Planet Miura|Miura]], all paid for by the [[GMG]] and [[Kishiro]]. Despite the extremely high levels of security, there have been a number of attacks on the installation by the [[Hogosha]], who prefer to use lightning hit and run strikes against the jump gate site in order to disrupt progress. Because of this, many of the DSE workers are demanding higher wages due to the dangers involved, and efforts are being increased to tighten security around the base.
 
+
==Missions Offered==
Solely financed by [[GMG]] and [[Kishiro]], the speed of construction always was subject to the available funding, and recent economic turmoils as well as multiple attacks by criminal organizations such as the [[Hogosha]] have prolonged the estimated build time vastly, as well as causing hefty additional costs.
+
* [[Deep Space Engineering|DSE]]: $40,000 to $200,000 range
Considering that both companies expect a great revenue by shortening and securing the routes between the valuable gas fields in the Sigmas and safe Kusari space, new funds quickly could be raised to continue the project.
+
==Bribes Offered==
 
+
{{Spoiler|
The small ''Tarawa'' class station deployed by Deep Space Engineering always has been intended solely as a workers' camp and supply depot, and with the end of the project it has been disassembled, with hull elements being reused for the expansion of nearby [[Fujisawa Mining Facility]]. All valuable robotic and electronic components have safely been returned to DSE central depots.
+
* [[Deep Space Engineering|DSE]]
 
+
* [[Gas Miners Guild|GMG]]
{{Clear}}
+
* [[Kishiro Technologies]]
 +
}}
 +
==Commodities==
 +
{{Exports|
 +
* None
 +
}}{{Imports|
 +
* [[Basic Alloy]]
 +
* [[Food Rations]]
 +
* [[Gate/Lane Parts]]
 +
* [[Robotic Components]]
 +
* [[Synth Paste]]
 +
}}{{Clear}}
  
 
[[Category: Border Worlds]]
 
[[Category: Border Worlds]]
 
[[Category: Deep Space Engineering]]
 
[[Category: Deep Space Engineering]]

Revision as of 13:36, 6 December 2013

Note: This is a station that last existed in version 4.85.2 of the Discovery Freelancer mod and has now been removed. Below is a history of the station under DSE and the proceedings that occured from the beginning of the construction to the present day.


Sigma-19 Gate Construction Site
Takawa class Station
Owner
DSE
Location
6G, Okinawa
Technical Data
Gravity Complete
Docking bays Yes
Amenities Yes
Crew 675

With construction of the jump gate having been underway for some time, the project is still expected to take a while longer to complete, especially given the strict directives to Deep Space Engineering, who are being paid a very handsome amount of money for their silence and speed in the construction project.

Considerable amounts of supplies are constantly being shipped in to both the construction site and the nascent beginnings of a trade lane route to the planet Miura, all paid for by the GMG and Kishiro. Despite the extremely high levels of security, there have been a number of attacks on the installation by the Hogosha, who prefer to use lightning hit and run strikes against the jump gate site in order to disrupt progress. Because of this, many of the DSE workers are demanding higher wages due to the dangers involved, and efforts are being increased to tighten security around the base.

Missions Offered

  • DSE: $40,000 to $200,000 range

Bribes Offered

Commodities

Exports
  • None
Imports