Difference between revisions of "Stokes Mining Station"

From Discovery Wiki
Jump to navigationJump to search
(replaced: {{Version|4.85.3}} → {{Version|4.85.2}})
Line 8: Line 8:
 
| sector = 4F
 
| sector = 4F
 
| house = {{House Link | Bretonia}}
 
| house = {{House Link | Bretonia}}
| owner = [[Kusari Naval Forces]]
+
| owner = [[Gallic Metal Service]]
 
| gravity = Partial
 
| gravity = Partial
 
| docking = Yes
 
| docking = Yes
Line 14: Line 14:
 
| population = 800
 
| population = 800
 
}}
 
}}
Stokes Mining Station was run by [[Bretonia Mining and Manufacturing]] (BMM) until 817 A.S.. It was the largest orbital facility in all of Bretonia and has operated continuously for centuries. Aside from BMM, representatives from [[Kusari]] shipping companies were also present, negotiating for the basic materials required to fuel their own industries.
 
  
In 817 A.S., when Kusari fleets reached Stokes, [[Bretonia Armed Forces]] chose to defend the station at all costs. The decision was rumored to be inspired by BMM lobby within the [[New London]] government elite. From strategic point of view, this was a grave mistake, since Stokes is a large and spread out installation hardly suitable for defensive purposes. Bretonian fleets around Stokes were swiftly scattered and had to retreat, and station itself was captured by Kusari Naval Forces with minimal casualties.
+
The Stokes Smelter was run in continuous operation by Bretonia Mining and Manufacturing (BMM) until 817 A.S. It was the largest orbital facility in all of Bretonia and has operated for centuries, manufacturing Basic Alloys, Hull Panels and refining various types of ore. The station was seized by Kusari forces in 817 A.S. during their invasion of Leeds, and again in 819 AS when the Gallic invasion followed in the wake of the Kusari forces. Both times the station suffered significant damage, but large sections remained operational. Late 818 A.S., as it became evident that Gallia would eventually breach Leeds, Bretonia Mining and Manufacturing began moving its most critical facilities on Stokes to Southampton.
 
+
[[Samura]] and [[Kishiro]], despite their fierce competition, joined forces to operate the facility after it was overtook from BMM. The mining operations were restored in a matter of weeks by Kusari workers brought from [[Kyushu]]; it was rumored that certain [[IMG]] members and former BMM employees collaborated with Kusari companies.
+
After securing the immediate area around the station, the Gallic Metal Service was tasked to get the station operational. Thus far, only some of the refineries have been restored, and the GMS has tentatively begun extracting resources from the nearby asteroid field.
 
==Missions Offered==
 
==Missions Offered==
* [[Kusari Naval Forces]]: $15,000 to $25,000 range
 
 
==Bribes Offered==
 
==Bribes Offered==
 
{{Spoiler|
 
{{Spoiler|
* [[Deep Space Engineering|DSE]]
 
* [[Gateway Shipping]]
 
* [[Kishiro Technologies]]
 
* [[Samura Industries]]
 
 
}}
 
}}
 
==Commodities==
 
==Commodities==

Revision as of 20:13, 18 September 2013

Warning.png
Article possibly outdated (
v4.85.2
)

This article has not been verified to be up to date for the latest version of the Discovery mod. The last edit was made on 18.09.2013 (DD/MM/YYYY). You may help by updating it, often by using the code generator.
Stokes Mining Station
Wellington class Station
Stokes Mining Station.jpg
Owner
Gallic Metal Service
Location
4F, Leeds
Technical Data
Gravity Partial
Docking bays Yes
Amenities Limited
Crew 800

The Stokes Smelter was run in continuous operation by Bretonia Mining and Manufacturing (BMM) until 817 A.S. It was the largest orbital facility in all of Bretonia and has operated for centuries, manufacturing Basic Alloys, Hull Panels and refining various types of ore. The station was seized by Kusari forces in 817 A.S. during their invasion of Leeds, and again in 819 AS when the Gallic invasion followed in the wake of the Kusari forces. Both times the station suffered significant damage, but large sections remained operational. Late 818 A.S., as it became evident that Gallia would eventually breach Leeds, Bretonia Mining and Manufacturing began moving its most critical facilities on Stokes to Southampton.

After securing the immediate area around the station, the Gallic Metal Service was tasked to get the station operational. Thus far, only some of the refineries have been restored, and the GMS has tentatively begun extracting resources from the nearby asteroid field.

Missions Offered

Bribes Offered

Commodities

Exports
  • None
Imports