Discovery Gaming Community

Full Version: <DSLE>Kansas Storage Depot 1
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
[Image: c7110c6e-5a65-43a6-be71-5bba5224c205_zpsqddqc8af.jpg]


Kansas Storage Depot 1

[Image: 1d335cfd-b973-4534-9602-47cf08e51459_zpsnsnj5odj.jpg]

Base Information:



Base News:

1. Core 3 upgrade in progress.
2. Contract Information bottom of page.

Base Details:

Current Core Level: Core 2

Desire Core Level: Core Level 5

Shield Generator: Not Active

Storage 1: Complete

Storage 2: Complete

Storage 3: Complete

Defense Turret 1: Classified



Equipment The Base Is Accepting:


1.

Buying Price:
Selling Price:

2.

Buying Price:
Selling Price:

3.

Buying Price:
Selling Price:

4.

Buying Price:
Selling Price:


Commodities The Base Is Accepting:

1. Robotic Hardware

Buying Price: $1250/unit
Selling Price: n/a

2. Hull Segments

Buying Price: $1500/unit
Selling Price: n/a

3. Industrial Hardware

Buying Price: $2500/unit
Selling Price: n/a

4.
Buying Price:
Selling Price:


Contract Information:

1. If you want a contract please fill out the form below.

2. We have the right to reject your request for a contract for any reason.

3. The product on the base will be change to the amount of said contract amount as soon as the contract as been approved.

4.. All jobs must start within 1 day of being approved.

5. The contracts amount will take in effect how long the run is, how dangerous the run is, how much you can haul at one time and the amount of time allowed for the contract to be finish. The amount will be fair. We are not here to cheat anyone out of hard earn credits.

6. All Contracts will have a time limit set by the contractor or the holder of the contract.

7. If the contract is not done on time a deduction amount will be taken out of the price of the product and the contractor will have to accept that amount or forfeit the contract. It is normally between 50 credits and 100 credits per unit depending on the contract.

8. If the job is done on time then a 10 million bonus will be paid to the contractor.

9. If the job is never done and or the contractor quits the job then he or she will be locked out of the base and the contract will go to someone else. He or she name and the ship ID numbers will be put on the list to be deny for future contracts with the corporation.

10. If there are complaints about the contractor behavior and the said contractor does not explain his or her position on the complaint the contract will be voided out and the contractor will be deny future contracts with the corporation.

11. All pirate attacks and credits payed to said pirate is not refunded by the holder of the contract.

12. You the contractor enter this contract at your own risk.

13. All approve contracts are final.


Contracts: (All estimates are based on a 5k transport)

1. Robotic Hardware: 35,800 left (Short run) (Dangerous level-Medium)
Selling: Planet Los Angles, California-$250/unit (total $1,250,000)
Buying: Kansas Storage Depot 1, Kansas-$1250/unit (total $6,250,00)
Profit around: $5,000,000/per run/per 5k transport

2. Hull Segments: 40,000 left (Short run) (Dangerous level-Medium)
Selling: Freeport 4, Magellen-$500/unit (total $2,500,000)
Buying: Kansas Storage Depot 1, Kansas- $1500/unit (total $7,500,000)
Profit around: $5,000,000/per run/per 5k transport

3. Industrial Hardware: 86,800 left (Long run) (Dangerous level-High)
Selling: Trenton Outpost, New York-$200/unit (total $1,000,000)
Buying: Kansas Storage Depot 1, Kansas- $2500/unit (total $12.500,000)
Profit around: $11,500,000/per run/per 5k transport

4.Pending


Contract Code:



Code:
1. Name of company/single person:

2. Years the company/self has been active:

3. Ship(s) names that will be involved in the contract:

4. Contract #(1,2,3 or 4):

6. Time to complete job:

Sign you name here: