09-20-2016, 06:49 AM
»» Transmission: Incoming Signal
»» Receiver: Gateway Shipping
»» Encryption: NC100 High Encryption
»» Subject: Phase (A) Core Upgrade
»» Receiver: Gateway Shipping
»» Encryption: NC100 High Encryption
»» Subject: Phase (A) Core Upgrade
Good Evening,
Gateway Shipping representative,
My name is Aurora Lewis, the director of operations of Nebula Complex for Science and Technology, a freelancer installation 10k south Birmingham Station at Manchester system. I am assigned by Sir Simon Sorrell, the chief executive officer of Nebula Complex, to contact your respected corporation about moving some required materials to our complex. We are currently constructing Phase (A). The phase require several amounts of Heat Sinks so it gets completely constructed and secured to hold phase (B) above it. We are contacting Gateway Shipping since it is known as one of the most famous shipping corporation at Bretonia space. The ongoing constructions require the movement of 20,000 Heat Sinks from Planet New London in New London system to the Nebula Complex at Manchester system. As the docking master, i would like to offer 1,250 credits for each piece of Heat Sinks moved to the complex. I understand that Planet New London produce Heat Sinks and offer them for the price of 500 a piece. The price that we are offering will make a net profit of 750 credits per piece for the transporters. I hope this will be a satisfying price for the short trip from New London to Manchester system. I will wait your answer on this channel as soon as possible sir, and I was ordered to reach you the greetings of Sir Simon Sorrell and his apology for not being in this conference because he is extremely busy with the ongoing projects of the complex. Have a good evening sir.
.