----Recipient: Kruger Mineralien---
----Sender: Lead Engineer Alex Martin----
I've gone and hauled that Industrial Materials you asked for - A little over 20.000 in the end. Here's the cargo logs,
If it all checks out, then please send the credit bonus to [FL-ER]Bank, and I'll see if I can do some more runs soon,
Take care,
Stay safe out there
『Source: < Dr.-Ingr. Klaas Holmström | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Krüger Mineralien | Daumann Heavy Construction, Engineering Division
『Message Type: Debriefing Report
『Convoy Participants:
- N/A
『Route taken, amount of materials delivered:
DHC-Raubling
- 50 Construction personnel from Oder Shipyard to Freeport 8.
『Notizen des Kapitän:
I, along with our construction crew, have arrived on Freeport 8 aboard Raubling. Raubling will be ferrying our crew members and vital repair equipments as needed for maintenance of our Heavy Lifters, utility ships and tools to the construction site on Mecklenburg in the coming weeks.
Forgive the short report, but I will have to attend a meeting shortly to brief everyone of our plans and make sure that everything is running smoothly as it should.
I will personally remain on site for a two days to observe and oversee the initial phase of the drydock construction, after which I will depart for Oder.
Raubling will remain in the system to ferry everything until the end of project.
[DHC-Raubling approaching Freeport 8]
[Ferrying Crew and Equipment to Mecklenburg Station]
[Heavy Lifters Undocking to Begin Assembling Construction Material]
『Dr.-Ingr. K. Holmström
『Daumann Heavy Construction
『Engineering Division