Discovery Gaming Community

Full Version: Project "Blade"
You're currently viewing a stripped down version of our content. View the full version with proper formatting.


[Image: 9p8Qe3i.png]


For internal use only. Unauthorised access restricted.


ENGINEERING TASK
to develop and manufacture experimental
cruiser "Blaster" turret

Project's Orderer: Sirius Coalition Expeditionary Corps
Project's Executor: Sirius Coalition Expeditionary Corps Engineering Division
Project's Logistic: VEKTOR SOE

DOCUMENTATION
Sirius Houses convention which prohibited cruiser "Razor" weapon caused disappearing of manufacturing facilities. To replace this niche with our own equipment, was suggested re-create this weapon, by engineering heavier gunboat variant.

Note: As was reported, Gallia, which not tied with such limits, already produce similar weapon.

[Image: miYOTHB.png]

Stabilisation of antimatter encasement field did stuck with unpredicted modulation problems, caused by particles mass fluctuation in vacuum. From another side, cruiser energy distibution system, designed for heavy weapon, such as cryogenic antimatter projectors, allow to increase energy efficency and refire rate, by increased capacitors and heat sink systems energy consumption.

Was rendered impossible and non optimal to sustain uniform parameters of antimatter on big range, so was considered installation of 1300 distance limiter.

Weapon combat specifications
NameRangeMuzzle speedRPS
Blaster13009001.33

MANUFACTURING QUEUE
Ship, considered for test:
  • CPW "Belgorod"
Total quantity - 2 turrets.

CPW "Belgorod" typhoon class destroyer will be first "hunter" - destroyer. Crew dossiers show enough competency to test new weapon in combat conditions.

ADDITIONAL RESOURCES

1000 of energy field equipment.

To produce experimental variant, additional energy field amplificators required.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.




For internal use only. Unauthorised access restricted.


STATUS UPDATE

Required components delivered to Mykolaiv Research Station.
Experimental manufacturing line set in work.
The "Belgorod" crew was moved on another typhoon destroyer, "Cossack". This warship was detached to TSB| and ready for uprgades on Sevastopol Depot repair facility.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.




For internal use only. Unauthorised access restricted.


TEST SUMMARY
[Image: ycsIYkF.gif]
Footage of tests on Mykolaiv polygon.

Prototypes demonstrate expected performance both in polygon's conditions and combat. After further analysis of weapon use in combat situations, initial "hunter" conception turned into "barrage" destroyers for fleet actions and patrols.

Supposed primary targets is snub-crafts, gunboats, cruisers. Engage of battlecruisers is not advised, battleships pose deadly threat. This shift of primary targets in comparison with standard typhoon determines desired use in fleet.

Data, collected after main test program by RO-3, confirms high efficiency in this role.

Engineering department consider as possible to manufacture this weapons in limited series.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.




For internal use only. Unauthorised access restricted.


MANUFACTURING QUEUE Total quantity - 4 turrets.

ADDITIONAL RESOURCES
  • 2.000 of energy field equipment.
STATUS

Materials arrived. Workshop in work.

STATUS UPDATE

Turrets produced and stored.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.




For internal use only. Unauthorised access restricted.


MANUFACTURING QUEUE Total quantity - 12 turrets.

ADDITIONAL RESOURCES
  • 6.000 of energy field equipment,
  • 6.000 of tungsten.
STATUS

Materials arrived. Workshop in work.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.