Discovery Gaming Community

Full Version: LD 14 - Industrial Complex
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
[Image: 0gSlFb3.gif]
Bretonia Mining and Fabrication
LD 14 Industrial Complex

Bretonia Mining and Fabrication, is well known to be one of the prime constructors, producers and gold ore distributors in Sirius.

Following the Leeds recovery plan, BMF heads the reconstruction of LD 14 - Industrial Complex.
Being based in one of the only sources of abundant Uranium in Sirius, LD-14 was both a mining station and a refinery.

The station was sieged and successfully boarded by the Gallic Royal Navy during their push into Leeds not long after the fall of Stokes, despite dogged resistance from the York and her fleet. The Gallic Navy suffered heavy casualties in this assault, not having been prepared for the high radiation inside the field, some of which having been deliberately caused by the Armed Forces as they fragmented Uranium-rich asteroids, scattering irradiated micro-asteroids throughout the LD-14 asteroid field. Nearly all of the surviving Gallic forces involved in the assault on LD-14 suffered some form of radiation poisoning.

Recently the Gallic Royal Intelligence has taken an interest in LD-14 as a means to better understand the intricacies of Bretonian equipment, and gain insight into their refining methods. Using the high levels of background radiation to mask their presence, the GRI assets aboard LD-14 have been able to work almost entirely undisturbed throughout the operation.

After securing the immediate area around the station, the Gallic Metal Service was tasked to get the station operational. Thus far, only some of the refineries have been restored, and the GMS has tentatively begun extracting resources from the nearby asteroid field.

Later on the Galic War, LD 14 and Stokes Mining Station were destroyed by the Galic forces.

In 827 A.S. Bretonia Mining and Fabrication heads the reconstruction of LD 14 into a massive mining, refinement and fabrication complex, as a statement of Bretonian corporate pride.

This installation will be using state of the art technology, developed through our research, can now use new faster ways of construction, our dearest and most renowned Scientists, leaded by our Chief Operation and Deputy Manager, Prof. Barba Negra, have developed this new way of 3D printing construction.

The 3D construction site system is so versatile and fast, we will be using it to 3D print the remaining of the LD 14 - Industrial Complex on the spot.

Through the focusing of electron charged particles we can now implement the actual printing of a complete Instalation in one third of the time it would take to build it piece by piece.

This new technology, comes with several advantages:

1- Safety of our customers
Although we have changed proprietary, BMF's quality standards remain as high as ever.
Our customers installation designs, as well as their technological secrets, are assured by our simple process of base printing.
All is needed is a quick selection of the intended model class station, and the Printing Head will start the printing of the installation.

2- Ownership Warranty
Every single installation ID printed, must be fitted with the communication components and Main Operating Systems by the client.

3- Reliability
The process of 3D printing a installation while not allowing any secrets to be disclosed, offers an unprecedented precision to the production of the installation.
Blue diamonds have a special role here as their colour produces a special frequency beam that allows the printer head to "know" which materials go where.

4- Speed
The study of the refractory qualities of diamonds within artificially created anomalies allows the effective separation of materials during the smelting process, allowing the precise 3D printing of different space station systems without the possibility of error.
The fact is that, as soon as schematics are "feed" to the Printer Head System, the 3D production process begins, we have effectively reduced the construction time of any given installation by its half.



LD 14 - Industrial Complex Construction Project
Total Budget = 380.000 Units of Raw Materials
Stage 1: The Super Structure

Stage 2: The Main Reactor & Life Support

Stage 3: The Electrical & Primary Refining Systems