Discovery Gaming Community

Full Version: The IKN-Reiwa
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Kusari Naval Forces
[Image: X04Ng2q.png]


Project "Reiwa"
"Amaterasu"-class Liner, modified.
Status: Phase III, Active


No outside parties will be made aware of the plans or construction. Workers and hired contractors will sign an agreement that prevents them from revealing information about the vessel to outsiders.


Primary Objective:

The latest Project for Kure Shipyard, labelled "Reiwa" is of uncommon nature to the Naval Forces. A joint venture between the Imperial Diet and the Naval Forces Headquarters, Project "Reiwa" aims to to transform an "Amaterasu"-class Luxury Liner into the preeminent vessel for diplomatic missions conducted by the Empire's highest representatives.

The Amaterasu-class Luxury Liner, Samura Industries latest breakthrough in luxury ship building, quickly became renowned for its opulence and extravagance throughout the colonies - rendering it the ideal vessel to project Kusari's values and status whenever it arrives in foreign space.

While it possesses formidable armaments and heavy armor, it falls short in terms of the advanced internal security measures required to safeguard the Empire's elite, a flaw to be corrected through this very project.

Development phases:

  • Phase I: Acquisition of an "Amaterasu"-class from Samura Industries. Concluded with funds provided by the Imperial Diet.

  • Phase II: Provision of external armament. The vessel was successfully outfitted with standard Naval Forces equipment due to near flawless compatibility attributed to Samura Industries great thoughtfulness.

  • Phase III: Installation of various additional security measures and general modifications:

    1. 78x "Sanitizer"-class Kishiro built Automated Non-Lethal Stun Guns
    2. 34x "Kuju-zai"-class Automated Lethal Machine Guns
    3. 65x "Jouka-sha" Autonomous Security Bots
    4. 4x Private Quarters to receive last-generation quantum field generators as anti-surveillance barrier.
    5. Full replacement of all biometric scanners with KOI standard versions.
    6. Full conversion of lower deck B-3, section 1-5 into a field hospital for emergencies.

    Due to security concerns, all additional security features will be assembled/produced locally at Kure Shipyard. Therefore, the following materials to be delivered by the respective Keiretsu are required:

    • Energy Field Equipment - 20.000 standard units
    • Medical Equipment - 15.000 standard units
    • Nanocapacitors - 10.000 standard units
    • Optronics - 15.000 standard units
    • Pharmaceuticals - 5.000 standard units
    • Quantum Multiplexors - 7.500 standard units
    • Superconductors - 10.000 standard units
    • Robotics - 15.000 standard units



Attachments:

Kusari Naval Forces
[Image: X04Ng2q.png]


Project "Reiwa"
"Amaterasu"-class Liner, modified.
Status: Phase IV, Active


No outside parties will be made aware of the plans or construction. Workers and hired contractors will sign an agreement that prevents them from revealing information about the vessel to outsiders.



Phase III Status:


Following the swift aid of Senkaku Regional Development, a Samura Industries subsidiary, all required materials arrived at Kure Shipyard four months ago. With the Nagasaki modernization efforts and the simultaneous mothballing of the Sado, Kure shipwrights could offer infrequent attention to the Reiwa only. With the highly sensitive security measures in place, further modifications will be sourced to one of the civil shipyards. Phase III is hereby concluded.


Phase IV:


All three two civil shipyards of Kusari will be contacted about their current capabilities and available timeslots. The most time efficient offer will be taken. The Reiwa will be transferred from Kure Shipyard to the designated shipyard. -> Concluded. Samura's Yokohama Shipyard possesses free capabilities.


Further modifications to be installed there are:
  • Expansion of its fighter craft docking bay to accommodate an additional vessel.
    Estimated required materials:
    • 2,500x Hull Panels
    • 5,000x Industrial Materials
    • 5,000x Robotics
    • 2,500x Copper
    • 2,500x Niobium
    • 2,500x Molybdenum


  • Custom tailoring of the private quarters as per instructions of government officials.
    Estimated required materials:
    • 2.500x Bio-Neural Processors
    • 10.000x Unmarked Computerware
    • 5.000x Gold
    • 10.000x Fire Pearls
    • 2.500x Diamonds
    • 2.500x Xenobiotic Filters



Attachments: