02-08-2010, 01:57 AM
:: Accessing Database ::
:: Security Clearance Required ::
:: Enter Username | Tanja Harren ::
:: Enter Password | ******* ::
:: Access Granted ::
:: Creating New Document ::
:: Opening Document;
:: Saving to Archive ::
:: Save Complete ::
:: Disconnecting from Database ::
:: Security Clearance Required ::
:: Enter Username | Tanja Harren ::
:: Enter Password | ******* ::
:: Access Granted ::
:: Creating New Document ::
:: Opening Document;
Date: 0911814 - 0800 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Today we completed Software updates on the Unit, our main task starts from now, we have to install the AI Software on an actual Land-Drone Hardware.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Today we completed Software updates on the Unit, our main task starts from now, we have to install the AI Software on an actual Land-Drone Hardware.
Date: 1211814 - 0341 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: After Three days and Two nights of work, we finally finished the test drone, filed as UN17-A1, It was hard to call it with that name, so we had to perform some modifications to its Voice recognition System to answer to sentences starting with 'A1'. We are launching a test Drive tomorrow morning.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: After Three days and Two nights of work, we finally finished the test drone, filed as UN17-A1, It was hard to call it with that name, so we had to perform some modifications to its Voice recognition System to answer to sentences starting with 'A1'. We are launching a test Drive tomorrow morning.
Date: 1211814 - 0920 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Unit is ready for test drive, we had uploaded random waypoints around the station and placed random boxes on its way, The main goal would be testing unit's ability to act on its own, finding fastest route through corridors and avoiding all the boxes.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Unit is ready for test drive, we had uploaded random waypoints around the station and placed random boxes on its way, The main goal would be testing unit's ability to act on its own, finding fastest route through corridors and avoiding all the boxes.
Date: 1211814 - 1456 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Test was unsuccessful. Unit ended up turning around itself after the last checkpoint. This problem could be easily solved by implementing one of the already designed AI Programs, but that is not our current goal, the goal is designing a unit that can think on its own. We will resume working on the unit in two days.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Test was unsuccessful. Unit ended up turning around itself after the last checkpoint. This problem could be easily solved by implementing one of the already designed AI Programs, but that is not our current goal, the goal is designing a unit that can think on its own. We will resume working on the unit in two days.
Date: 1411814 - 2248 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: We found a few bugs that are now fixed, Another test drive would be launched tomorrow morning.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: We found a few bugs that are now fixed, Another test drive would be launched tomorrow morning.
Date: 1511814 - 0800 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: A similar test is designed again, but this time it would be done without error - Or I hope so.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: A similar test is designed again, but this time it would be done without error - Or I hope so.
Date: 1511814 - 1311 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: This time, results were good, but not as good as we'd been expecting. Unit encountered a few errors on the way, therefor acting 'confused' and standing in one place for more than 30 seconds.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: This time, results were good, but not as good as we'd been expecting. Unit encountered a few errors on the way, therefor acting 'confused' and standing in one place for more than 30 seconds.
Date: 1511814 - 2338 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: I contacted our Software team and informed them about the situation, they will be providing us with an updated version of the same software in two weeks.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: I contacted our Software team and informed them about the situation, they will be providing us with an updated version of the same software in two weeks.
Date: 2911814 - 1152 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Updated Software came in today, which is not really good, They had to change some parts of the Navigation program so we will have to remodel the unit hardware to make it completely operational.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Updated Software came in today, which is not really good, They had to change some parts of the Navigation program so we will have to remodel the unit hardware to make it completely operational.
Date: 0212814 - 0900 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Hardware modification is complete, the new software will be installed on unit today, and another test drive in two days.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Hardware modification is complete, the new software will be installed on unit today, and another test drive in two days.
Date: 0212814 - 1933 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Software is not fully installed, seems we had a misunderstanding on how it works, so the hardware needs to undergo further modifications, this will delay the test drive about one week.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Software is not fully installed, seems we had a misunderstanding on how it works, so the hardware needs to undergo further modifications, this will delay the test drive about one week.
Date: 1112814 - 0720 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Modifications finally complete, and software fully installed. The test drive will be this afternoon.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Modifications finally complete, and software fully installed. The test drive will be this afternoon.
Date: 1112814 - 1600 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Test results showed 100% success, the unit is now operational as a Land-Drone, we were rewarded with an extended new year vacation, we will start working on the new Unit to make it ready for Space Operations in the next year.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A1
Comment: Test results showed 100% success, the unit is now operational as a Land-Drone, we were rewarded with an extended new year vacation, we will start working on the new Unit to make it ready for Space Operations in the next year.
Date: 0401815 - 0925 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Today we started our studies of the required modifications on the A1 to upgrade it to A2, which would be operational in Space.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Today we started our studies of the required modifications on the A1 to upgrade it to A2, which would be operational in Space.
Date: 1601815 - 1159 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Finally we managed to list every single required modifications on Unit A1, the list will be sent to Software devision tomorrow morning, We have to wait for the updated Software before starting modifications on the A1 Hardware.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Finally we managed to list every single required modifications on Unit A1, the list will be sent to Software devision tomorrow morning, We have to wait for the updated Software before starting modifications on the A1 Hardware.
Date: 0902815 - 0926 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Updated Softwares came in last night, We should start modifying the hardware, but first, we'll need exact type or required components.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Updated Softwares came in last night, We should start modifying the hardware, but first, we'll need exact type or required components.
Date: 1102815 - 1143 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We finally managed to get a complete list of all the components we need, and because we dont have some of them ready here, we will have to wait till they come in. Ah girl, all these night shift works is making me tired, I think I should get a few days off ...
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We finally managed to get a complete list of all the components we need, and because we dont have some of them ready here, we will have to wait till they come in. Ah girl, all these night shift works is making me tired, I think I should get a few days off ...
Date: 1502815 - 1927 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: The parts came in right now, we should start putting them together tomorrow morning.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: The parts came in right now, we should start putting them together tomorrow morning.
Date: 1902815 - 0013 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Hardware is successfully installed, we will perform a test flight outside the station tomorrow.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Hardware is successfully installed, we will perform a test flight outside the station tomorrow.
Date: 2002815 - 1106 AM
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Unit 'A2' is now in space and we designed a similar test like the one we used on A1, but this time, Unit has to fly in space and get around all the boxes.
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Unit 'A2' is now in space and we designed a similar test like the one we used on A1, but this time, Unit has to fly in space and get around all the boxes.
Date: 2002815 - 1834 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Test results: Failure, we tried restoring the backup software a few times but didnt work. Seems the unit is not responding to the checkpoints above or below it.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Test results: Failure, we tried restoring the backup software a few times but didnt work. Seems the unit is not responding to the checkpoints above or below it.
Date: 2802815 - 0932 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: New software came in today, We will launch another test flight this afternoon.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: New software came in today, We will launch another test flight this afternoon.
Date: 2802815 - 1643 PM
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: We designed a similar test, unit is in space and operational, and we will start the test in a few minutes.
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: We designed a similar test, unit is in space and operational, and we will start the test in a few minutes.
Date: 2802815 - 1943 PM
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Results were better than the previous test, we just need some minor Hardware modifications to improve Unit's response time to its software.
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Results were better than the previous test, we just need some minor Hardware modifications to improve Unit's response time to its software.
Date: 0103815 - 1855 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Hardware improvement is now complete, tomorrow morning is scheduled for next test.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Hardware improvement is now complete, tomorrow morning is scheduled for next test.
Date: 0203815 - 0645 AM
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Test flight is ready to begin, I hope we wont run into any more errors this time.
Location: Research Ship 'Recknitz' - Bremen System
Subject: AI-UN17-A2
Comment: Test flight is ready to begin, I hope we wont run into any more errors this time.
Date: 0203815 - 1304 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Results were perfect, unit responded to its software and the objectives with perfect accuracy, next step would be getting it ready for combat situations.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Results were perfect, unit responded to its software and the objectives with perfect accuracy, next step would be getting it ready for combat situations.
Date: 1103815 - 1722 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: They really want us to install this Unit inside an actual Combat Ship?!
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: They really want us to install this Unit inside an actual Combat Ship?!
Date: 1203815 - 1046 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: They brought us a Banshee Light Fighter today, I'm not really satisfied with the direction this project is heading.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: They brought us a Banshee Light Fighter today, I'm not really satisfied with the direction this project is heading.
Date: 1803815 - 1916 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We finished installing all the components needed for Unit to interact with Ship Navigation and Targeting Systems, Software-Side improvements will be done in a few days.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We finished installing all the components needed for Unit to interact with Ship Navigation and Targeting Systems, Software-Side improvements will be done in a few days.
Date: 2403815 - 2012 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: New software came in today, now it contains a flexible Hostile/Threat recognition protocol, we'll be testing its Combat capability in a few days.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: New software came in today, now it contains a flexible Hostile/Threat recognition protocol, we'll be testing its Combat capability in a few days.
Date: 2703815 - 1644 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We will be testing A2's combat ability against a military Drone today, I am now not even one bit satisfied with the direction this project is headed.
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: We will be testing A2's combat ability against a military Drone today, I am now not even one bit satisfied with the direction this project is headed.
Date: 2703815 - 2109 PM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Results were clear from the beginning, we didnt even need a test. Unit was destroyed in 5 seconds, How the hell should I tell them ? This is NOT a Combat Unit!
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Results were clear from the beginning, we didnt even need a test. Unit was destroyed in 5 seconds, How the hell should I tell them ? This is NOT a Combat Unit!
Date: 2903815 - 1154 AM
Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Perfect! After all the hard work me and everyone else had put on this project, Admiral just comes in and calls this whole project 'Waste of Money and Time' and shuts it down? I'm out!
; Closing Document ::Location: Munster Research Station - Bremen System
Subject: AI-UN17-A2
Comment: Perfect! After all the hard work me and everyone else had put on this project, Admiral just comes in and calls this whole project 'Waste of Money and Time' and shuts it down? I'm out!
:: Saving to Archive ::
:: Save Complete ::
:: Disconnecting from Database ::