11-13-2023, 05:41 PM
>Logging in...
>Unpacking Data...
>Decrypting...
Estemeed colleagues,
as some of you may already know, Senkaku Research and Development has recently been allowed to possess three Ashigaka-Class Gunboats by the Naval Forces. Given callsigns are as follows:
>SRD]Jingei
>SRD]Asadori
>SRD]Hayasu
They are currently stationed on Yokohama Shipyard in New Tokyo and, due to their history and usage by the 66th, require ground-up modernization and repairs. In detail, the second vessel, the SRD]Asadori has an extensively damaged outer hull and the weaponry-systems are offline, the SRD]Jingei has taken severe damage near its engine-section and the damage done has also had an impact on the generator. The SRD]Hayasu has only taken light damage and thus will only be subject to modernization and basic repairs.
For these repairs to become possible, we will require several thousands of components, hull plates et cetera. Below you'll find a list put together by our engineers that will show exactly what is required of you to ship to Yokohama Shipyard as soon as possible.
SRD]Jingei
Both the Jingei and the Asadori will require an additional 4.500 Units of Nanotubes each, which will be outsourced to another party to help speed up the process. Additionally, the required Hull Panels and Engine Components will be provided by Yokohama itself. Below you will find a list of commodities and the payout that the SRD will provide ontop of what Yokohama Shipyard will pay upon delivery.
This brings the total contract volume to 2.875.000 Sirian Credits. We hope that these vessels will soon see the light of day and bask in the light of glory once more.
Sincerely,
Yoshimoto Susumu, Senkaku Research and Development
>SRD]Jingei
>SRD]Asadori
>SRD]Hayasu
They are currently stationed on Yokohama Shipyard in New Tokyo and, due to their history and usage by the 66th, require ground-up modernization and repairs. In detail, the second vessel, the SRD]Asadori has an extensively damaged outer hull and the weaponry-systems are offline, the SRD]Jingei has taken severe damage near its engine-section and the damage done has also had an impact on the generator. The SRD]Hayasu has only taken light damage and thus will only be subject to modernization and basic repairs.
For these repairs to become possible, we will require several thousands of components, hull plates et cetera. Below you'll find a list put together by our engineers that will show exactly what is required of you to ship to Yokohama Shipyard as soon as possible.
SRD]Jingei
- Ablative Armor Plating - 15.000x
- Optronics - 10.000x
- Quantum Multiplexors - 5.000x
- Industrial Materials - 20.000x
- Superconductors - 10.000x
- Energy Field Equipment - 15.000x
- Ablative Armor Plating - 20.000x
- Hull Panels - 10.000x
- Quantum Multiplexors - 5.000x
- Industrial Materials - 5.000x
- Energy Field Equipment - 10.000x
- Engine Components - 7.500x
- Ablative Armor Plating - 5.000x
- Hull Panels - 5.000x
- Optronics - 5.000x
- Engine Components - 2.500x
Both the Jingei and the Asadori will require an additional 4.500 Units of Nanotubes each, which will be outsourced to another party to help speed up the process. Additionally, the required Hull Panels and Engine Components will be provided by Yokohama itself. Below you will find a list of commodities and the payout that the SRD will provide ontop of what Yokohama Shipyard will pay upon delivery.
Ablative Armor Plating | Total Required: 40.000 | Bonus Payout: 40/Unit |
Optronics | Total Required: 15.000 | Bonus Payout: 20/Unit |
Quantum Multiplexors | Total Required: 10.000 | Bonus Payout: 20/Unit |
Industrial Materials | Total Required: 25.000 | Bonus Payout: 10/Unit |
Superconductors | Total Required: 10.000 | Bonus Payout: 15/Unit |
Energy Field Equipment | Total Required: 25.000 | Bonus Payout: 15/Unit |
This brings the total contract volume to 2.875.000 Sirian Credits. We hope that these vessels will soon see the light of day and bask in the light of glory once more.
Sincerely,
Yoshimoto Susumu, Senkaku Research and Development