• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Communication Channel
« Previous 1 … 1101 1102 1103 1104 1105 … 2161 Next »
To: Bowex | RE: "Bowex Civilian Carrier - Supply Contract"

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Pages (4): « Previous 1 2 3 4 Next »
To: Bowex | RE: "Bowex Civilian Carrier - Supply Contract"
Online jammi
05-09-2015, 11:53 AM,
#11
Badger Pilot
Posts: 6,542
Threads: 360
Joined: Aug 2007
Staff roles:
Story Dev
Economy Dev


[+]OORP Important Notes and Guidelines
//We have 1 month to complete all the modules and get the ship active. If this doesn't happen, an RP event will be triggered to continue the construction RP elsewhere. Furthermore, on the completion of a module, a dice role will be made by a member of Bowex's HC. As this is a prototype test-bed model, things may go wrong!

1-5: Successful construction - all goes well and according to plan.
6-7: Minor Errors - problems means 25% of the modules commodities will need to be re-delivered.
8-9: Major Errors - significant problems mean 50% of the module's commodities will need to be re-delivered.
10: Catastrophic failure - the module's construction has completely failed and will need to be totally re-done.

The somewhat suspect blueprints that had been released onto the open market appeared to be rife with minor errors. In particular, minor hull depressurisations could have led to disaster. These errors have since been patched at an additional cost of time, money and resources. The basic superstructure is now complete, and awaiting the installation of more modules.
[+]Stage 1: The Ship Hull
Hull Segments - 5,000 units - Done
High Performance Alloy - 2,500 units - Done
Super Alloy - 2,500 units - Done
Basic Alloy - 2,500 units - Done
Titanium - 1,250 units - Done
Beryllium - 1,250 units - Done
Aluminium - 1,250 units - Done

Status: Complete.
Reply  
Offline Jazzi
05-09-2015, 12:33 PM, (This post was last modified: 05-09-2015, 12:48 PM by Jazzi.)
#12
Member
Posts: 709
Threads: 160
Joined: Mar 2015

Incoming Transmission from Scarborough Station, Newcastle
09/05/822 A.S.
[Image: xX6XyAc.png]

To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Stage 1 Complete

Good Day Mr. Hudson,

It is with great pleasure that I can announce that, despite the difficulties, the hull segments for the Carrier have been completed! Due to the strong efforts of the trade fleet, we have overcome the thermal plating issue, and can now proceed to Stage 2 of the design - the reactor and engine modules. Please see below an up-to-date list of the materials needed for this stage.

[+]Spoiler
Industrial Hardware - 10,000 units
Super Alloy - 5,000 units - Done
Basic Alloy - 5,000 units
Mox - 10,000 units
Engine Components - 10,000 units
Beryllium - 2,500 units - Done
Aluminium - 2,500 units
We are eagerly awaiting the arrival of the shipments, so please don't delay!


Encrpyted Data package - please submit Senior Staff Authorisation key to open:
[+]Spoiler
Encryption Key Valid - Access Granted
Thank you for bearing with our need for secrecy. There is another requirement that the designs can benefit from. One of our professional coffee-makers suggested adding nuclear-fission converters to the engine designs. As much as it pains to say it (we no longer have a Coffee-maker in the office), his designs were validated. They add an element of stability and redundancy that can only improve the vessel.

That being said, we would need 6000 units of Nuclear devices. Preferably the Rheinland type; they have a proficiency for such technologies. Understandably, there acquisition will have to be off the books, but I've flirted enough with the accountants for us to get away with it... like making a deal with the devil.

If you have manage to bring some of these back, dock onto Scarborough mooring D4. The cargo staff have been briefed and adequately blackmailed.


Sebastian Cooper
R&D Director
Borderworld Exports

[Image: 4kgRLJu.png]

Reply  
Offline Connor
05-10-2015, 01:41 PM,
#13
Nomadmin
Posts: 3,606
Threads: 327
Joined: Aug 2012

Incoming Transmission from Scarborough Station, Newcastle
[Image: 1HWlf.png]
To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract


Message Contents:

Another load of shipments for today! This time, Basic Alloy and Industrial Hardware!

[+]Attachment
Attachment One
Attachment Two
Attachment Three

Tim Becket
Employee
Borderworld Exports
Transmission End

[Image: Snoopyman.gif]
Reply  
Offline St.Denis
05-10-2015, 02:57 PM,
#14
Member
Posts: 100,601
Threads: 1,347
Joined: Dec 2011

Incoming Transmission from Scarborough Station, Newcastle
10/05/822 A.S.

To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract

I have delivered some of the required Commodities.

7820 Engine Components


Proof of Delivery:

http://imgur.com/Z8lwHci,uTJMt8t

Yours aye,

George Grenville
Supervisor
Borderworld Exports


Transmission End

'I would like to be half as clever as some people like to believe they are'
Life is full of disappointments, it is how we handle them that helps to define us, as a person
Reply  
Offline Alex Freeman
05-10-2015, 03:07 PM,
#15
Member
Posts: 12
Threads: 0
Joined: Apr 2014

Incoming Transmission from Scarborough Station, Newcastle
10/05/822 A.S.
[Image: 1HWlf.png]
To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract


Message contents:

The rest of engine components and 2500 units of aluminium have been delivered.
[+]Attachment
Attachment


Alex Freeman
Employee
Borderworld Exports

Transmission End
Reply  
Offline St.Denis
05-10-2015, 04:36 PM,
#16
Member
Posts: 100,601
Threads: 1,347
Joined: Dec 2011

Incoming Transmission from Scarborough Station, Newcastle
10/05/822 A.S.


To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract

Further to my last Report, I have now delivered some more of the required Commodities.

10,000 MOX


Proof of Delivery:

http://imgur.com/DeMQAmE,WghWD7W,8tfbk0v

Yours aye,

George Grenville
Supervisor
Borderworld Exports


Transmission End

'I would like to be half as clever as some people like to believe they are'
Life is full of disappointments, it is how we handle them that helps to define us, as a person
Reply  
Offline TheProphet
05-10-2015, 06:18 PM, (This post was last modified: 05-10-2015, 07:16 PM by TheProphet.)
#17
Badger Co-Pilot
Posts: 211
Threads: 10
Joined: Apr 2011

Incoming Transmission from Scarborough Station, Newcastle
10/05/822 A.S.
[Image: 1HWlf.png]
To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract


Message Contents:

Funny weather, eh?

[+]Encrpyted Data package - please submit Senior Staff Authorisation key to open
Attachment One
Attachment Two

William McCullough
Senior Employee
Borderworld Exports
Transmission End

[Image: YITahuf.png]
Reply  
Offline St.Denis
05-10-2015, 08:42 PM, (This post was last modified: 05-10-2015, 09:14 PM by St.Denis.)
#18
Member
Posts: 100,601
Threads: 1,347
Joined: Dec 2011

Incoming Transmission from Scarborough Station, Newcastle
10/05/822 A.S.


To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Supply Contract

Here is the 'Special Delivery' you requested.

1,955 High Pressure Rheinbiers

Proof of Delivery:
[+]Encrypted Data Package-please submit Senior Staff Authorisation Key to open

http://imgur.com/LD2CVk9

Yours aye,

George Grenville
Supervisor
Borderworld Exports


Transmission End

'I would like to be half as clever as some people like to believe they are'
Life is full of disappointments, it is how we handle them that helps to define us, as a person
Reply  
Online jammi
05-12-2015, 10:31 PM,
#19
Badger Pilot
Posts: 6,542
Threads: 360
Joined: Aug 2007
Staff roles:
Story Dev
Economy Dev


[+]OORP Important Notes and Guidelines
//We have 1 month to complete all the modules and get the ship active. If this doesn't happen, an RP event will be triggered to continue the construction RP elsewhere. Furthermore, on the completion of a module, a dice role will be made by a member of Bowex's HC. As this is a prototype test-bed model, things may go wrong!

1-5: Successful construction - all goes well and according to plan.
6-7: Minor Errors - problems means 25% of the modules commodities will need to be re-delivered.
8-9: Major Errors - significant problems mean 50% of the module's commodities will need to be re-delivered.
10: Catastrophic failure - the module's construction has completely failed and will need to be totally re-done.

The reactor and engine modules were fitted without a hitch, running both on schedule and without problems. After the initial technical hitches, the project appears to be going swimmingly, if marginally over-budget. At this point in the project, the vessel would survive being towed but likely could not fly under its own power.
Reply  
Offline Jazzi
05-14-2015, 11:19 AM,
#20
Member
Posts: 709
Threads: 160
Joined: Mar 2015

Incoming Transmission from Scarborough Station, Newcastle
14/05/822 A.S

[Image: xX6XyAc.png]

To: Peter Hudson
Priority: High
Topic: RE: Bowex Civilian Carrier - Stage 2 Complete

Dear Mr Hudson,

It is with great pleasure to announce that stage 2 has been completed! The shipments came in at a good pace, and the construction went underway without a hitch. Those... "High-Pressure biers" also proved instrumental in augmenting the power core to sustain such a magnificent vessel!

The next stage will require the following materials:


[+]Spoiler
PlasFoam Conduits - 5,000 units
Heat Sinks - 5,000 units
Basic Alloy - 10,000 units
Quantum Multiplexors - 5,000 units
Optronic Arrays - 7,000 units
Speed is of the essence, as word has passed through Scarborough that we do not have long. I trust the materials will reach us post-haste.

Sebastian Cooper
R&D Director
Borderworld Exports

[Image: 4kgRLJu.png]

Reply  
Pages (4): « Previous 1 2 3 4 Next »


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode