Under the Inverness Defense Protocol Legislation slated by the Directorate in 825 A.S. the Military Arm was granted a substantial monetary endowment to enact out the underlined objectives of the enactment. One of the details entails the defensive protocols and security of the ex-Drake, now Alberta, anomaly entry along with the subsequent restoration of the previous Gaian Outpost: Klaksvik Wreck.
Survey teams have revealed the extent of the damage, revealing that reactor core has imploded and contaminated the remaining wreckage. With the confirmed assistance of the (potentially) ALG, IMG and the Insurgency forces,
Decomination process will proceed after the required resources are obtained. Clean up crew must contain the bio-hazardous waste and sterilize the area. Establishment of the contamination protocol will entail the sealing of the wreckage with a thin layer, lined with Tungsten to prevent escape of any possible hazards.
STAGE 1 - Clean Up Wrote:5,000 Pharmaceuticals, stand-by for emergency medical. 5,000 Energy Field Equipment, to establish containment fields. 8,000 Industrial Materials, tools utilised in construction 10,000 Oxygen, breathing apparatus for clean up crew and emergency resource. 10,000 Basic Alloy, materials used to make layering for containment. 10,000 Tungsten, materials used in radiation shielding composite. 10,000 Toxic Waste, to extract and store.
Logistics vessels provided every needed assets to begin the clean up operations of the Klaksvik Wreck.
Medical teams set up posts to provide safety for the clean up crew. Canisters to store the bio-hazardous waste are made with the provided assets.
The clean up teams will proceed with sterilizing the area and to prepare the next future steps of the restoration project.