• OBJECTIVE:Build and prepare AP-609 for Interspace Commerce
• ASSIGNED APM PERSONNEL:Director A. Romero; APM Engineering, Interspace Commerce, Renzu Corporation and people given access by either of this groups • AUDIT:Director A. Romero • STATUS:CANCELLED
Overview
Interspace Commerce VIP was assaulted by pirates, so a bit more heavier vessel is request by IC. Materials needed for construction of AP-609 are attached bellow. List of materials provided by Renzu is still needed.
AP-FILE #0528 is going to be archived at the moment. No shipments have been delivered. Should the Interspace Commerce change their mind or wish to restore this file, they can contact us.