• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 88 89 90 91 92 … 385 Next »
Battlegroup Harmony - GRN Destroyer Status

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Battlegroup Harmony - GRN Destroyer Status
Offline Insurgency Navy
03-24-2019, 07:41 PM,
#1
For a cup of Liber-tea
Posts: 231
Threads: 55
Joined: Jan 2016

[Image: harmonylogo.png]

Battlegroup Harmony



GRN Destroyer Overhaul Status

Overview

The RNS Cassard has safely arrived at Marshall Station and entered the drydock. Our engineers have done extensive scans and inspections to figure out a plan to restore the vessel to a combat ready state. The hull is in good condition but most major systems are missing or dysfunctional.

Currently planned system updates:
  • ▷ Power Core
  • ▷ Wiring Harness
  • ▷ Internal Systems
  • ▷ Scanner arrays

[Image: 4OzJJAH.png]
Infopage - Roster - Message Dump - Communications Archive - Ship Database
Bounty Board - Recruitment | Reward Board - Mission Board
Reply  
Offline Insurgency Navy
03-24-2019, 07:46 PM, (This post was last modified: 03-30-2019, 03:40 PM by Insurgency Navy.)
#2
For a cup of Liber-tea
Posts: 231
Threads: 55
Joined: Jan 2016

[Image: Reactor-icon.png]

Power Core


Supply and Engineering Status

The current power core inside the ship was of makeshift civilian manufacturing. The salvaged generator of an Archer-class cruiser shall replace it to fuel the ships systems.
To refit the generator for the ship we require some additional materials.

Cargo Needed Delivered Status
Nuclear Devices 2.000 0 Outstanding
Gadolinium 4.000 0 Outstanding
Superalloy 5.000 0 Outstanding
Superconductors 5.000 0 Outstanding
Thorium MOX 5.000 0 Outstanding
Reply  
Offline Insurgency Navy
03-30-2019, 03:42 PM, (This post was last modified: 03-30-2019, 03:42 PM by Insurgency Navy.)
#3
For a cup of Liber-tea
Posts: 231
Threads: 55
Joined: Jan 2016

[Image: Superconductors.jpg]

Wiring Harness


Supply and Engineering Status

The current connections within the ship need to be reworked. The wiring harness requires a considerable amount of resources to be adapted and checked fully.

Cargo Needed Delivered Status
Beryllium 3.000 0 Outstanding
Gold 2.000 0 Outstanding
Superconductors 2.000 0 Outstanding
Reply  
Offline Insurgency Navy
03-30-2019, 03:45 PM, (This post was last modified: 03-30-2019, 03:46 PM by Insurgency Navy.)
#4
For a cup of Liber-tea
Posts: 231
Threads: 55
Joined: Jan 2016

[Image: Software.jpg]

Internal Systems


Supply and Engineering Status

With most of the GRN's systems removed from the vessel we will have to completely replace all internal systems with our own versions.
This will be one of the most resource intensive parts of the construction.

Cargo Needed Delivered Status
Bio-Neural Processors 1.000 0 Outstanding
Cryocubes 1.000 0 Outstanding
Nanocapacitators 1.000 0 Outstanding
Optronics 2.000 0 Outstanding
Quantum Multiplexors 1.000 0 Outstanding
Yttrium 1.000 0 Outstanding
Reply  
Offline Insurgency Navy
03-30-2019, 03:49 PM, (This post was last modified: 03-30-2019, 03:49 PM by Insurgency Navy.)
#5
For a cup of Liber-tea
Posts: 231
Threads: 55
Joined: Jan 2016

[Image: Scanner_bs.png]

Scanner arrays


Supply and Engineering Status

With most of the GRN's systems removed from the vessel we will have to completely replace all internal systems with our own versions.
This will be one of the most resource intensive parts of the construction.

Cargo Needed Delivered Status
Spyglass Scanner Suite 1 0 Outstanding
Reply  


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode