The drydock has been completed and connected to the extention of Sector 3. The drydock has been reinforced with Niobium and Tungsten like the rest of the station to prevent it from becoming a weak point.
With the final units of Industrial Material delivered and installed on Kinkaku-ji, the shipyard is soon to be fully operational.
Kinkaku-ji's engineers have began their final assessment. The drydock will be thoroughly inspected for any assembly faults, the energy levels will be measured at points prone to overload, and the engineers will have to be instructed and get used to working with the new hardware.
Therefore will will gradual build up the operational status of the new Shipyard.