Good Evening all. Cloud-1 Is Repaired and up and running again, and to give her a proper shakedown, we did some long hauls to get Project JD48712 as close to compleation as possble, So i filled the last quotas of Super conductors and some High Tempreture Alloys, we did unload some Industrial Materials as well, although they are surplus. We also filled the Silver Quota as well once the crew had a rest day on Gran Canaria.
Manifesto is as follows: 2990 Industrial Materials
8970 High Tempreture Alloys
2990 Super Conductors
2990 Silver