Director of Human Resources here.
Just to show how things should be done - Director style. At that point, however, I would like to thank the captains of my ships for putting in some extra effort to get this build done in the shortest amount of time possible.
For the project Docking Module DM0213 (1&2)
My fleet has delivered:
29'990 Units of industrial materials
4984 Ship Hull Panels
4985 Units of Super Alloy
14'955 Robotics
Proof: link
Note: I guess the proof for one delivery of IMs is missing, however, both Doking modules have been built, which should be proof enough.