(02-24-2014, 05:33 AM)SMI-Great.Fox Wrote: Phase 1: Completion of the Koeln trade Lane Mk. I
With the Koeln lane as our testbed, we will be combining new state of the art equipment to allow faster travel speeds and a better defense against pirate craft. The immediate benifits of this project are to Wuppertal Station, allowing mining companies across sirius access to its new facilities and the best that ALG has to offer. The Aluminum fields and surrounding solar bodies will be easier to access and allowe far more relative safety as Rheinland's finest are able to reach the scene of an attack or robbery 5 times faster than on basic cruise speed.
Phase 2: The Hamburg - Koeln Line
Recently with help from our great minds across Rheinland, we have discovered the location of a jump hole in the Koeln system which will allow us to appropriate the construction of a Gate system to connect the system of Hamburg to the reasources of Koeln. Origionally a shipment from Hamburg to Koeln would take hours to reach one way, and much longer for a trip back. With the creation of this new gate and lanes, shipments can be moved at a fraction of the time, saving costs in fuel and headaches of the transport captians across the sector. Time is Money, use both well.
Phase 3: Rheinland Retrofit
With our success in our shipping vessels, a team of some of our best minds are currently hard at work designing a new lane system, allowing for the passage of larger vessels at the command of our Kanlzer to be moved with greater ease and agility. To that end, the entire Rheinland based lane network, excluding The Koeln - Hamburg line, will be salvaged and rebuilt, Starting with the lane from Planet Berlin, along the great Dauman Complex "The Ring" to the stations of Kruger and ALG. Thus showing the unity of our great companies who serve the our people every day.
Excuse the confusion, but how did RepEx get all techy with lanes? Ageira products explicitly state they cannot be opened without the Ageira biometric key upon which not even DSE have.
Not too mention, how can RepEx be in a financially viable position to undertake such a project yet the rest of the House is in a state of decay?
I'd like to see the full disclosure on how and when RepEx got the means to out-tech DHC and circumvent Ageira technologies incompatibility with anything other than other Ageira tech in your implementation of Rheinland developed equipment on these lanes. Who in Rheinland would even have the know-how? Solar stuff cannot be adapted to Ageira stuff, so if it were based on Gallic technology, how can Rheinland, let alone RepEx be able to financially support such a development/rebuild?
On the flip side, Ageira/DSE/DHC/IC would be interested in helping you logically make it work if you choose to approach us about it.