7401 Hull Segments from Alster Shipyard to Geneva Defense Platform
14805 units of Cooper from Briesen Facility to Alster Shipyard
With Metropolis job being finished, next on the list to start supplying was Geneva Defense Platform, as they have dealt with issue that stoped us from finish the work last time, Hannover started off with fresh loads of Hull Segments.
We managed to deliver 3 full loads of those before our shift ended. No pirate activity was reported, so I guess that would be all for now.
Attaching visual confirmation of all 3 runs below.
[1] [2][3] Transport pilot Jon Brunswick Daumann Heavy Construction Mining Division and Transportation