The Admiralty is studying your request and will give a definitive answer within the week.
Meanwhile, please make sure to have understood the directives specified in Kusari Legal Codex section 8, and in particular :
(09-16-2010, 06:48 PM)Kusari Kaigun Wrote: 8.1All bases constructed in Kusari sovereign space must be registered in the Regulation Database. The vessels authorized to supply each base must be, then again, registered against the same database.
8.3All bases, unless exempted in writing, are subject to the following conditions:
Shall not be constructed within 5K of an existing structure. This includes other bases, tradelanes, jump gates or docking rings.
Shall not be positioned as to obstruct tradelanes, docking points or other areas of heavy traffic flow.
Shall not deploy defense modules within 4K of other structures, unless authorized in writing.
Shall incorporate the name tags of all lawful Kusari authorities into their base administration computers.
Shall not be used as any kind of freeport within Kusari space.
Shall not be used as staging ground or repair depot for groups that are hostile to Kusari.
Shall be owned and operated by persons in good standing with Kusari authorities.
Shall not construct the following factory modules without written permission: Hyperspace Survey Manufacturing Factory, Cloaking Device Factory, Jump Drive Factory.
8.9Bases to be constructed outside of the designated free zones are subjected to a one time fee for approval of the project, dependent of the System where the base is located:
New Tokyo, Hiroshima: 120M Credits
Honshu, Kyushu Systems: 80M Credits
Shikoku, Hokkaido: 60M credits
Rishiri, Tottori, Nagano: 50M credits
8.11Supplying vessels caught carrying the commodities listed in section 3.1.5 and not registered against the Bases regulation database will be considered as guilty of the smuggling violation, and will therefore expose themselves to fines, cargo confiscation or destruction.
You are also requested to prepare the financial means necessary to honor the fee required for construction projects in Nagano system, would the project be authorized by House Kusari authorities.