Flight log: Nicole Griffith
I was tasked by President White to investigate damage done to docking ring and mooring fixture of planet Kurile, deep in Sigma-17 star system. After the arrival we initiated diagnostic protocol of damaged hardware and results are more than clear. Scan indicates mooring fixture sustained the worst hit and cannot be repaired, however approximately 23% of all parts seem to be alright and may be repurposed if the Guild would love to purchase new fixture.
Docking ring didn't sustain as much damage as mooring fixture did, however data provided by our scan confirmed that docking ring is NOT operational at the moment and won't be in near future. Signal transmitter used for docking requests and approvals is missing, defense grid was damaged beyond repair and one of the engines located above exit, ensuring that exit will be "open", malfunctioned during tests, however power grid remained in tact. New software calculations and codes will be needed in order to ensure safety of all landing ships in the future.
There are two options we may offer to the Guild. Repairs are possible and cheaper than construction of completely new docking ring, however malfunctions may occur sooner due to age of the hardware. New docking ring would provide Guild with up to date defense grid and heavily encrypted software with much longer lifespan.
825-04-07 19:22 Left Pueblo station proximity 825-04-07 19:50 Entered Sigma-19 825-04-07 19:55 Entered Sigma-17 825-04-07 19:56 Course set to planet Kurile 825-04-07 20:00 Scanning initiated 825-04-07 20:00 Scanning completed 825-04-07 20:49 Left planet Kurile 825-04-07 20:56 Arrived to Atka 825-04-07 20:00 Scans uploaded - #No.1Scan, #No.2Scan, #No.3Scan