"La Grosse Dame" construction is coming to its finish and thus soon we are going to start build a next ship: "Becquerel" Research Liner. As I have mentioned, it should been enhanced with 8th grade armour upgrade but because of recourses issues we cannot make it. Instead, we will use 6th grade as most optimal replacement of it.
You would find that some of the deliveries were completed even before it started. Let it won't distract ye will use resources remained after "La Grosse Dame" construction to build this ship.
"Becquerel" construction status: CANCELLED Last update:27.01.743
Dr. Raza on behalf of the MAE R&D Division requested this ship to be constructed in no time. The recourses from the following list are to be delivered to the Fourchambault shipyard in Dauphine.
Required materials:
Hull
Material
Amount
Ablative Armor Plating
10,600/7,500
Basic Alloy
18,400/15,000
Ship Hull Panels
25,200/25,000
Ultralloy
8,300/6,250
Navigation (systems)
Material
Amount
Bio-neural Arrays
800/2,000
Optronics
400/8,000
Quantum Multiplexors
2,400/6,000
Power System
Material
Amount
Industrial Materials
1,200/15,000
Magnets
600/7,500
Nanocapacitors
600/7,500
PlasFoam Conduits
1,200/15,000
Solar Panels
2,600/4,500
Superconductors
600/7,500
Tungsten
600/7,500
Engine
Material
Amount
Engine Components
600/5,000
Thermal Control System
Material
Amount
Heat Sinks
1,200/30,000
Cargo Management System
Material
Amount
Robotics
2,600/1,500
Energy Field Equipment
2,600/1,500
Living Quarters & Research Laboratories
Material
Amount
Consumer Goods
600/12,500
Nanotubes
1,200/25,000
Plastics
600/12,500
Use the following template for delivery reports to keep our main internal net channel clear of flooding with shipping reports. Do not forget to timestamp your visual log of cargo origin and delivery. Besides, different in time deliveries should be reported separately in the manifest. I hope you got what I mean.
Yes, bureaucracy things which everyone loves much. A necessary evil.