DSE)Goose LOG:
One round trip to the construction site in Tau-23. Kusari seemed down right chilling, not a major patrol in sight.
Maybe this is the start of a deteriorating embargo.
Gate parts: 959
Beryllium: 4797
The normal cut was transferred to operations.