Key Information Designation: Alexanderwerft Location: New Berlin, Postdam Polar Orbit Loc Data: < 54900 1266 -2670 O.19 11 -18 > Station Administrator(s):Daumann Heavy Construction Docking Access:RESTRICTED
The construction of the Alexanderwerft station represented the first stage of major expansion works at the company's venerable Oderwerft Facilities at The Ring, begun in early 826 A.S. The station will form the basis of the specialist construction department's core facilities, serving as a manufacturing facility for advanced technological systems and armaments. Integral development plans for the station include primary and secondary wharf facilities, with the aim of providing docking facilities for the installation of advanced equipment - thus freeing up primary wharf space at the Oderwerft.
Construction plans include Primary Structure, Docking Bays, Housing Facilities, Customer & Staff Support Facilities, Office & Workshop Spaces, as well as advanced Manufacturing complexes and associated wharf space.
Rheinwehr Equipment Registry Status:ACTIVE Orders:Priority Orders Only Requisitions
Bundespolizei Equipment Registry Status:ACTIVE Orders:Priority Orders Only Requisitions
Item Icon
Item Name
Description
Availability
----
Jump Drive MK. II
The Series II Hyperspace Jump Drive Module creates a wormhole to move a ship between any two points in Einsteinian space.
This module has an integated multi-mode fusion power plant that can run on a variety of fuels. Ships of significant size and mass
The Series III Hyperspace Jump Drive Module creates a wormhole to move a ship between any two points in
Einsteinian space. This module has an integated multi-mode fusion
power plant that can run on a variety of fuels.
Ships of Significant size and mass.
The Series IV Hyperspace Jump Drive Module creates a wormhole to move a ship between any two points in
Einsteinian space. An integated multi-mode fusion power
plant that can run on a variety of fuels.
This module has the ability to jump a ship of significant size and mass.
Cloaking Devices bend EM radiation to render a ship invisible to most sensors.
Cloaking devices, have an integrated multi-mode fusion power plant capable of generating power from Cloaking Batteries. Small Craft.
Cloaking Devices bend EM radiation to render a ship invisible to most sensors. Cloaking devices have an integrated
multi-mode fusion power plant capable of generating power from Cloaking Batteries. Gunboats and Freighters.
A cloaking device bends EM radiation to render the ship invisible to most sensors. It allows a ship to remain cloaked for
a short time but uses significant amounts of fuel when active.
This device is suitable for mounting on capital ships such as cruisers, battlecruisers and battleships.
A cloaking device bends EM radiation to render the ship invisible to most sensors. It allows a ship to remain cloaked for a
short time but uses significant amounts of fuel when active.
This device is suitable for mounting on transports..
We are pleased to announce that Phase VI Construction has now begun. Shipment requirements have been announced, all Daumann Logistik captains may begin shipments, report your deliveries as per standard operations report in the Internal Reporting Terminal.
Commodity
Quantity
Status
Robotic Hardware
10,000
Incomplete
Optronic Arrays
20,000
Incomplete
Quantum Arrays
20,000
Incomplete
Bio-Neural Arrays
10,000
Incomplete
(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.