Client REDACTED contact established via internal communications. Client delivered subject vessel, one (1) OSC-CST-005 "Taurus" of non-original manufacturer provenance to Research & Development Facilities at the Alexanderwerft Shipyard facility on 08.06.826. Initial review of the vessel was undertaken, and completed 18.06.826. Review determined no faults, or flagable issues. Completion of the project brief on 18.09.826, allows for the modifications to be undertaken.
Space-Frame Stress Tess Analysis showed all factors within or above guideline standards. Alloy composition tests and spectral analysis indicated no manufacturing failure or stress-fractures in hull, space-frame or primary vessel components. Alignment and other standard tests revealed no noteworthy deficiencies. No modifications or repairs necessary. Software Analysis tests reveleaed that the vessels is operating on a relatively standard Operating System and Navigational Computer available on the open civilian market. System purge and installation of adapted Daumann designed military grade systems recommended.
Ship Data:
Ship Class Super Heavy Fighter
Designed by Orbital Spa and Cruise
Built by Provenance Unknown
Technical information:
Guns/Turrets 4 / 4
Opt. weapon class 10
Max. weapon class 10
Other equipment
Cruise Disruptor
Counter Measure
Mine Launcher
Hull strength 24,000
Max. shield class 6
Cargo space 245 units
Nanobots/Batteries 145/145
Max. impulse speed 80 m/s
Max. thrust speed 199 m/s
Max. cruise speed 375 m/s
Power output 15,900 u
Power recharge 1,650 u/s
Project Stages:
The project will proceed in four (4) stages, to be undertaken by the relevant specialist departments at the restricted Alexanderwerft facility.
Systems Overhaul
Purge of existing Operating System & Data
Installation of custom, proprietary, military Operating System
Installation of military-grade Navigational Computer
Ship Overhaul
Installation of military-grade Armour Plating
Installation of upgraded Military-grade Powercore
Installation of upgraded military-grade Engine System
Installation of military-grade Thruster
Installation of enhanced Kusarian-sourced Scanner System & Sensor Suite