TCL Sending Operative : Chief of Logistics David Jamison
TCL Recipient : CEO, VP, Senior Directors
Message Details : Phase-1/Route Scanning
Encryption : Extremely high
Dear Colleagues,
I have arrived back in the Galileo system with a team of Engineers and with the TCL|Cypriot loaded with a significant quantity of Reinforced Alloy extrusions in preparation for the following proposed disassembly of the annex stations in preparation for their movement.
Our preliminary recommendation is that after removing external storage tanks and smaller modules to be moved via Titanics due to their single cavernous holds, the remaining linear segments be strengthened to withstand bending and flexing via the method shown below, using Annex 1 as an example.
Our further recommendations continue along this line of logic, continuing to use bracing where necessary as shown above.
Please advise me directly if the Board has any questions or concerns.