Message Details : Heavy Lifters in position ready for base movement
Encryption : High Priority
Good day to you all,
Myself and Steve Hornet initiated the procedures needed to position the Hercules towing-vessels with their heavy lifting rigs, to dismantle the structures, as proposed by David Jamison on previous communications.
Both installations have had four Hercules platforms move into position to ready the transportation of more components from Annex - 1 and Annex -2.
These lifters will work on a shift pattern within the next 48 hours to complete the work and will then proceed to tow the installations to Dublin, using the route that has already been planned by our Chief of Logistics.
Below you will find documentation of the lifters in position. Myself as well as other crucial personell will be on sight for the next 48 hours to ensure this operation starts well and can be completed as soon as possible. This in turn would allow for a timely start to the moving part.
As pictured at Annex-1 here we have 4 Hercules making preparations for the dismantling of anything that can be stowed aboard our Titanic transports which have been fitted internally to accomodate more space by removing non essential systems and pods.
Another 4 heavy lifters are placed at Annex-2 and also ready for the same procedures.
Once we have initiated these procedures we will bring the operation into the movement stage.