ATTN OF: .......... Her Majesties Bretonian Government
SUBJECT: .......... Goldgeist rebuild,
Bretonian Government - Department of Registered Bases
Sir/Madam,
We apologise for the inadvertent post in our prior communication. Deep Space Engineers (DSE|) have a very good working history within Bretonia and trust this not happen again. The confusion lay in our understanding from Mr. Cassidy requiring us to proceed with the rebuild of the Goldgeist mining base in Dublin which entails making certain the specifications are accurate.
Our instructions from Mr. Cassidy is that the base is to be built at the same designated area as was permitted in the original build. This was, according to records, approximately 10.6km directly to the right of the New London Jump hole, and 18.7km from the mining field beacon - 15km from the field actual and slightly below the horizontal plane.
We note permission was also granted for two defense turrets and wish to confirm this is still acceptable in Dublin.