6,490,000 11.28 Narita > The Ring (Multiplex)
1,585,000 3.7 The Ring > Bautzen (mining machinery)
6,930,000 13.21 Bautzen > Narita (Diamonds)
15,005,000/28minx60 = 32,153,572/hr
Just a few from a year old document.
Key:
Title, cargo quantity used in brackets followed by good and bad points
(from left to right) Net Profit, Time taken, Start > End, good in brackets.
Sum of net profit divided by total time taken times 60 (one hour) = total profit per hour