• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Communication Channel
« Previous 1 … 905 906 907 908 909 … 2158 Next »
To: Bowex) »» From: Nebula Complex

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Pages (4): « Previous 1 2 3 4 Next »
To: Bowex) »» From: Nebula Complex
Offline Hina Nakamura
09-25-2016, 09:02 AM, (This post was last modified: 10-28-2016, 11:32 PM by Hina Nakamura.)
#11
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: u68LHRk.png]

»» Transmission: Incoming Signal
»» Receiver: Border World Exports
»» Encryption: NC100 High Encryption
»» Subject: Phase © Core Upgrade

Good Evening,
Sir George Grenville,

It's me Ms Webb one more time and i am here with another contract if you are interested. The complex engineers are working on phase © now and we are in need for some materials. The offer we have is typical as the previous contract but with different quantities. The ongoing constructions require the movement of 30,000 High Performance Alloys from your Scarborough Station in Newcastle system to the Nebula Complex at Manchester system. As the docking master, i would like to offer 1,300 credits for each piece moved to the complex. I understand that Scarborough Station offers High Performance Alloys for 300 credits per piece. The price that we are offering will make a net profit of 1,000 credits per piece for the transporters. I hope this will be a satisfying price for the short trip from Newcastle system to Manchester system. I am sure that you are familiar with our style of business now, so we would like to remind you that we require a shipping manifest for each delivery to the complex along with time stamps. Thank you, i will wait your answer on this channel as soon as possible and have a good evening sir.



[Image: G8hTr6O.png]

[Image: 9MSv34t.png]
.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline St.Denis
09-25-2016, 03:09 PM,
#12
Member
Posts: 100,599
Threads: 1,347
Joined: Dec 2011

Incoming Transmission from Canary Wharf Station, New London.


[Image: 1HWlf.png]


To: Miss Webb.
Priority: High.
Topic: RE: Deliveries.


Message Contents:

Good afternoon Miss Webb,

We are happy to inform you, that we have deliver, as per your Request, the required 30,000 High Performance Alloy.

Please find below, the required proof:

High Performance Alloy

Feel free to contact us, at any time, if you need anything else supplied.

We pride ourselves on our Prompt Delivery Service.

George Grenville
Department Manager, Trade
Borderworld Exports


Transmission End

'I would like to be half as clever as some people like to believe they are'
Life is full of disappointments, it is how we handle them that helps to define us, as a person
Reply  
Offline Hina Nakamura
09-27-2016, 05:15 AM, (This post was last modified: 10-28-2016, 11:33 PM by Hina Nakamura.)
#13
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: u68LHRk.png]

»» Transmission: Incoming Signal
»» Receiver: Border World Exports
»» Encryption: NC100 High Encryption
»» Subject: Phase © Core Upgrade

Good Evening,
Sir George Grenville,

First of all, i would like to reach you the appreciation of our board's members about your corporation times of delivery, high quality products and shipping deliveries manifest documents. I can confirm the arrival of the requested amounts of High Performance Alloys to the Nebula Complex safely. We usually find one or two packages ruined from the transportation process which is acceptable error by our computers, but this time we found not a single ruined package which show your experience in moving things. Thank you again and we will contract Border World Exports again as soon as possible indeed. Have good evening Sir Grenville.



[Image: G8hTr6O.png]

[Image: 9MSv34t.png]
.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline Hina Nakamura
10-26-2016, 11:12 AM, (This post was last modified: 10-28-2016, 11:34 PM by Hina Nakamura.)
#14
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: Kj8eGmX.png]

Core Upgrade (3) Marker
You should Not reply to this marker

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline Hina Nakamura
10-29-2016, 05:43 PM, (This post was last modified: 10-29-2016, 05:45 PM by Hina Nakamura.)
#15
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: Yv0I7Uw.png]

»» Transmission: Incoming Signal
»» Receiver: Border World Exports
»» Encryption: NC100 High Encryption
»» Subject: Industrial Platform - Hull Segments

Good evening,
Bowex Representative,

It's me Natasha Jones, and i hope that you and yours are safe and sound. I am here to inform you that have reached an agreement on the Nebula complex board to initiate the constructions of our third phase. The third phase of our complex is massive and includes our industrial areas. We will need an incredible amounts of hull segments to supply our ongoing constructions. We would like to request shipping 30,000 Hull Segments which can be purchased from Southampton shipyard at New London system for 500 credits per pack. We are offering 1,500 credits per pack which will create a net profit of 1,000 credits per pack. I hope that this will be a satisfying price for the very short trip from Southampton to our complex at Manchester system.

We would like to request a shipping manifest for each shipment associated with a time stamp. It's very important for our database documenting process.
I will wait a reply from your respected corporation as soon as possible, and thank you for your business in advance *smile*. Have a good evening sir.



[Image: K8pZcfA.png]

[Image: 9MSv34t.png]
.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline DonSam
10-30-2016, 11:00 AM, (This post was last modified: 10-30-2016, 11:07 AM by DonSam.)
#16
Member
Posts: 182
Threads: 20
Joined: Nov 2015

Incoming Transmission from Scarborough Station, Newcastle
[Image: 1HWlf.png]
To: Natasha Janes
Priority: High
Topic: RE: Industrial Platform - Hull Segments

Sender ID: David Williams

Greetings Ms. Jones,

We are glad to accept your contract and please grant Bowex) tagged ships access to your installation and confirm back so we can start our shipping.

Thanks and have a good day.

Regards,
David Williams
Borderworld Exports
Transmission End
Reply  
Offline Hina Nakamura
10-30-2016, 01:08 PM, (This post was last modified: 10-30-2016, 01:08 PM by Hina Nakamura.)
#17
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: Yv0I7Uw.png]

»» Transmission: Incoming Signal
»» Receiver: Border World Exports
»» Encryption: NC100 High Encryption
»» Subject: Industrial Platform - Hull Segments

Good Afternoon,
Mr Williams,

We are glad that you accepted our contract for the offered price and i just got a confirmation from Evangeline Webb, that your tagged Bowex) vessels are granted access to the complex docking bay. Thank you for your time and business and until next time.



[Image: K8pZcfA.png]

[Image: 9MSv34t.png]
.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline Hina Nakamura
11-01-2016, 06:20 AM,
#18
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: Kj8eGmX.png]

Outgoing signal boost
You have 1 unanswered transmission

.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Offline DonSam
11-01-2016, 09:44 AM, (This post was last modified: 11-01-2016, 09:53 AM by DonSam.)
#19
Member
Posts: 182
Threads: 20
Joined: Nov 2015

Incoming Transmission from Scarborough Station, Newcastle
[Image: 1HWlf.png]
To: Natasha Janes
Priority: High
Topic: RE: Industrial Platform - Hull Segments

Sender ID: David Williams

Greetings Ms. Jones,

Thanks for your confirmation, we will start shipping immediately. expected delivery date within 1 week for this contract.

Thank you for choosing Borderworld Exports, have a good day.

Regards,
David Williams
Borderworld Exports
Transmission End
Reply  
Offline Hina Nakamura
11-01-2016, 01:54 PM, (This post was last modified: 11-01-2016, 01:57 PM by Hina Nakamura.)
#20
Member
Posts: 542
Threads: 41
Joined: Sep 2016

[Image: Yv0I7Uw.png]

»» Transmission: Incoming Signal
»» Receiver: Border World Exports
»» Encryption: NC100 High Encryption
»» Subject: Industrial Platform - Hull Segments

Good Afternoon,
Mr Williams,

Thank you for the reply, and i would like to ask if there is anyway to finish that small contract in less than 1 week (7days) ? I believe that some other corporate have almost the same amounts as your contract and did finish it in less than 3 days. My previous contracts with Border World Exports also was not done in that long time at all.

I will wait for an answer from you as soon as possible and if it cannot be done in lesser time, then we will decide what we will do about this contract according to your answer.
This contract is frozen now until you send a reply.
Thank you for your time and have a good afternoon.



[Image: K8pZcfA.png]

[Image: 9MSv34t.png]
.

[Image: Hv9Zwdu.png]

☆ NEBULA DISCORD NETWORK ☆ NEBULA DELIVERY HUB ☆ NEBULA TECHNOLOGIES - CAMBRIDGE ☆
☆ NEBULA INFORMATION BOT ☆ XENON GRAND SHOP
☆
WHEN EXCELLENCY BECOMES A HABIT

Reply  
Pages (4): « Previous 1 2 3 4 Next »


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode