Im contacting Bowex) as a brother company, to assist BMF in a very special task.
Given that the BMM along with DHC is already building a new shipyard for the BAF in Cambridge, we feel that our Lord MacRae Shipyard has somewhat lost his purpose,
As such, and after conveeing with our Engineering team it was decided to relocate Lord MacRae Shipyard infrastructure to Fortitudine,
Fortitudine has long been our most profitable Gold Trading Hub so we decided to upgrade it to better serve its purpose as well as expanding its cargo capabilities.
We would be ready to ascertain the costs of such gigantic operation as well as its details.
To: Mr. Dylan Hunt From:Scarborough Station - Newcastle / Bretonia Topic:relocate Lord MacRae Shipyard infrastructure to Fortitudine Date:25/06/827 A.S.
Greetings, Mr. Dylan Hunt
We happy you cotacted Bowex for another join venture.
The operation has already been completed by our staff along with the station crew .
The preparations for the towing procedure were already completed by the BMF staff.
This was a swift operation given the proximity of Fortitudine.
We implemented the structure from Lord MacRae Shipyard acording to your engineers sppecifications at Fortitudine at New London.
The cost of this operation was of 250 milion Sirius credits expenses were withdrawn from your instalation bank.
Best regards
See you later, Karl Lower
Director of Bowex and Director of Trade,
To: Mr. Dylan Hunt From:Scarborough Station - Newcastle / Bretonia Topic:relocate Lord MacRae Shipyard infrastructure to Fortitudine Date:18/11/827 A.S.
Greetings, Mr. Dylan Hunt
For some time now, our engineers, structural masters and other professionals relevant to what this endeade requires have been analyzing the pros and cons about dismantling, transporting to Paneta Cambridge and then to New London and depositing at Fortitudine Base for future processing of BMF projects.
In fact, we are already prepared to execute this project, entrusted to us.
We were just waiting for you to give us the go-ahead to start work. Our ships and sailors are based in the industrial sector of Cambridge, where we have an accommodation in the shed already destined for this contract.
We await your documentary contact.
Best regards
See you later, Karl Lower
Director of Bowex and Director of Trade,
Bretonia Mining and Fabrication
Isle of Skye, Planet New London Orbit Communication channel opened...
To:Bowex) Encryption:High Subject:Operation Stronghold - Fortitudine
Greetings Mr. Karl Lower,
It is with deepest joy that we give this contract as completed and fulfilled,
Once again Bowex) has proven its master professionalism and in the completion of yet another joint venture with Bretonia Mining and Fabrication,
Our engineers report that the super structure is at the desired position awaiting the final safety assessment in order to initiate the coupling process,
In the meanwhile, transformations will be made in order to adapt the factory lines space into a controlled environment that can sustain life,
This will allow us to have naturaly produced oxygen through hidroponics as well as healthy food production, mainly vegetables,
The storage depots will be converted into a water purification plant wich will suply the station needs as well as the granary.
As always Bowex staff is welcome at Fortitudine Tea and Pee Bar for a free drink after a well done job.