Detailed image of the 'shimmering' effect in action, main frame and subsystems constructed. Vessel nearing completion.
Atmospherics has been overhauled to permit for sub-section control. Details are specified within the report below.
Resources required: 5,000 units of Xenobiotic Filters for installation. An Expeditionary vessel will be sent out to probe for a temporary collaborator to haul the goods to our station.
ATMOSPHERICS OVERHAUL
Quote:
Control of Atmospherics has been overhauled to permit for 'sectioning' and generally optimized for greater levels of filtration. The current layout, presumably, used by the Rheinlanders was designed for cost, cutting corners to permit for more offensive systems. With no design intent of keeping the vessel on a bulky offensive, some of the circuitry had to be replaced in the grid to permit for space for implentation of the new atmospheric circuit. Large ventiliation shafts were installed at several keypoints for control and assessment, noted as 'filter rooms'. In the event of bio-contaminant failure within the system, override consoles have been implented to permit for manual control of the system, allowing subsections to be isolated if need be. Backup filtration systems are available upon emergency situations. Upon failure of the main system, the emergency filtration systems may be unlocked and utilized as the temporary filtration system, however, these systems are time limited to four weeks at maximum oxygen capacity, and cannot provide for more than 4 rooms. There are currently 4 auxiliary filtration systems in place in the event of ship failure or destruction, permitting time for rescue teams to find survivors.