Difference between revisions of "Chugoku Gate Construction Site"

From Discovery Wiki
Jump to navigationJump to search
(replaced: {{Version|4.85.3}} → {{Version|4.85.2}})
Line 1: Line 1:
{{Version|4.85.2}}
 
 
{{Base Infobox
 
{{Base Infobox
 
| name = Chugoku Gate Construction Site
 
| name = Chugoku Gate Construction Site
Line 14: Line 13:
 
| population =
 
| population =
 
}}
 
}}
In 798 A.S., construction was started on the jump gate leading to the [[Chugoku]] system, with most of the workers coming from Deep Space Engineering. Officially, the Kusari government states that the Chugoku system holds a considerable amount of mineral wealth that would benefit Kusari, but it is widely known that the primary reason for constructing the jump gate is to wipe out the [[Blood Dragon]] threat once and for all. Due to the heavy radiation and unpredictable gas clouds of the Hokkaido system, and the extremely high rate of terrorist attacks, [[Interspace Commerce]] refused to insure the venture until the Kusari government agreed to move the [[Battleship Matsumoto]] to cover the construction site.
+
In 798 A.S., construction was started on the jump gate leading to the [[Chugoku]] system, with most of the workers coming from [[Deep Space Engineering]]. Officially, the Kusari government stated that the Chugoku system holds a considerable amount of mineral wealth that would benefit thous house economy.
  
The jump gate construction project and the trade lanes leading to it were originally supposed to have been completed in 803 A.S., but thanks to the efforts of the Blood Dragons and their [[Golden Chrysanthemum]] allies, the project is more than three billion credits over budget and is still not close to being completed. [[Samura Industries]] is insistent that it will be constructed by 820 A.S. by the latest, but the commander of the Battleship Matsumoto, Shosho Tatsuya Mochizuki, remains intensely sceptical, as do others in [[New Tokyo]].
+
The jump gate construction project and the trade lanes leading to it were originally supposed to have been completed in 803 A.S., but due to the actions of the Blood Dragons and their allies, the project has been frequently disrupted and stalled and work is still being carried out. [[Samura Industries]] stated the gate's estimated completion date would be 820 A.S. by the latest, but others remain sceptical as to how much the project may cost as well as how long it will take.
 +
 
 +
The station that was originally designated as the Chugoku Gate Construction Site was a supply depot for the work being carrier out on the gate. But has since been handed over the [[Kusari State Police]] to provide further security to the project due to increased [[Blood Dragon]] activities as the project nears it's completion. The station, now retrofitted for police purposes now hails as [[Otaru Border Station]], and watches closer than the [[Battleship Matsumoto]] on the proceedings of [[DSE]]'s work to ensure the gate's swift completion.
 
==Missions Offered==
 
==Missions Offered==
 
* [[Deep Space Engineering|DSE]]: $40,000 to $55,000 range
 
* [[Deep Space Engineering|DSE]]: $40,000 to $55,000 range

Revision as of 21:14, 20 February 2012

Chugoku Gate Construction Site
Station
Owner
DSE
Location
3D, Hokkaido
Technical Data
Gravity unknown
Docking bays unknown
Amenities unknown
Crew unknown

In 798 A.S., construction was started on the jump gate leading to the Chugoku system, with most of the workers coming from Deep Space Engineering. Officially, the Kusari government stated that the Chugoku system holds a considerable amount of mineral wealth that would benefit thous house economy.

The jump gate construction project and the trade lanes leading to it were originally supposed to have been completed in 803 A.S., but due to the actions of the Blood Dragons and their allies, the project has been frequently disrupted and stalled and work is still being carried out. Samura Industries stated the gate's estimated completion date would be 820 A.S. by the latest, but others remain sceptical as to how much the project may cost as well as how long it will take.

The station that was originally designated as the Chugoku Gate Construction Site was a supply depot for the work being carrier out on the gate. But has since been handed over the Kusari State Police to provide further security to the project due to increased Blood Dragon activities as the project nears it's completion. The station, now retrofitted for police purposes now hails as Otaru Border Station, and watches closer than the Battleship Matsumoto on the proceedings of DSE's work to ensure the gate's swift completion.

Missions Offered

  • DSE: $40,000 to $55,000 range

Bribes Offered

Commodities

Exports
  • None
Imports