Mortagne Production Facility

From Discovery Wiki
Revision as of 13:00, 4 April 2012 by AlexBot (talk | contribs) (Change 4.86 pages to 4.86Betas so that we have a clean V4.86 category upon final release., replaced: {{Version|4.86 → {{Version|4.86Betas)
Jump to navigationJump to search
Warning.png
Article possibly outdated (
v4.86Betas
)

This article has not been verified to be up to date for the latest version of the Discovery mod. The last edit was made on 04.04.2012 (DD/MM/YYYY). You may help by updating it, often by using the code generator.
Mortagne Production Facility
Station
Image missing
Owner
Solar Engineering
Location
3D, Maine
Technical Data
Gravity unknown
Docking bays unknown
Amenities unknown
Crew unknown

The space around Mayenne was home to several installations, both civilian and (after the First Gallic War) military. After Fort Mortagne was decommissioned in 615 AGS, the Crown offered to sell the station for a low-price. Most corporations considered it to be too risky, despite hostilities on the Normandy border being rare. Solar Engineering, however, considered the place to be suitable for its new Holotainment Band production facility.

The Holotainment Band factory does not require numerous employees and finding a sufficient number of highly qualified workers within the Maine system was relatively easy. Station construction was completed in 641 AGS and it immediately started functioning. Currently it is the primary space based facility for Holotainment Band manufacturing in Gallia. Solar Engineering is cautious about security, and requested additional police patrols for the station and surrounding space after the invasion of Sirius began. It remains uncertain if the request is going to be fulfilled in the near future.

Missions Offered

No missions offered here

Bribes Offered

Commodities

Exports
Imports