YellowWarningTriangle.png This wiki is closed in favour of the new wiki. Information shown is likely to be very out of date.

Difference between revisions of "Chugoku Gate Construction Site"

From Discovery Wiki
Jump to navigationJump to search
m (Lost a | in the replacing operation. Oops.)
m (icon added)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
{{Base Infobox
 
{{Base Infobox
 
| name = Chugoku Gate Construction Site
 
| name = Chugoku Gate Construction Site
| image = chugoku gate.jpg
+
| image = Chugoku Gate Construction Site.jpg
 
| class =
 
| class =
 
| type = STATION
 
| type = STATION
Line 8: Line 8:
 
| sector = 3D
 
| sector = 3D
 
| house = {{House Link | Kusari}}
 
| house = {{House Link | Kusari}}
| owner = [[Deep Space Engineering|DSE]]
+
| owner = {{Icon|DSE}} [[Deep Space Engineering]]
 
| gravity =
 
| gravity =
 
| docking =
 
| docking =
Line 14: Line 14:
 
| population =
 
| population =
 
}}
 
}}
In 798 A.S., construction was started on the jump gate leading to the [[Chugoku]] system, with most of the workers coming from [[Deep Space Engineering]]. Officially, the Kusari government stated that the Chugoku system holds a considerable amount of mineral wealth that would benefit thous house economy.
+
In 798 [[A.S.]], construction was started on the [[Jump Gate]] leading to the [[Chugoku]] system, with most of the workers coming from [[Deep Space Engineering]]. Officially, the [[Kusari]] government stated that the [[Chugoku]] system holds a considerable amount of mineral wealth that would benefit thous house economy.
  
The jump gate construction project and the trade lanes leading to it were originally supposed to have been completed in 803 A.S., but due to the actions of the Blood Dragons and their allies, the project has been frequently disrupted and stalled and work is still being carried out. [[Samura Industries]] stated the gate's estimated completion date would be 820 A.S. by the latest, but others remain sceptical as to how much the project may cost as well as how long it will take.
+
The jump gate construction project and the [[Trade Lanes]] leading to it were originally supposed to have been completed in 803 A.S., but due to the actions of the [[Blood Dragons]] and their allies, the project has been frequently disrupted and stalled and work is still being carried out. [[Samura Industries]] stated the gate's estimated completion date would be 820 A.S. by the latest, but others remain sceptical as to how much the project may cost as well as how long it will take.
 +
 
 +
The station that was originally designated as the Chugoku Gate Construction Site was a supply depot for the work being carried out on the gate. But has since been handed over the [[Kusari State Police]] to provide further security to the project due to increased Blood Dragon activities as the project nears it's completion. The station, now retrofitted for Police purposes now hails as [[Otaru Border Station]], and watches closer than the [[Battleship Matsumoto]] on the proceedings of [[DSE]]'s work to ensure the gate's swift completion.
  
The station that was originally designated as the Chugoku Gate Construction Site was a supply depot for the work being carried out on the gate. But has since been handed over the [[Kusari State Police]] to provide further security to the project due to increased [[Blood Dragon]] activities as the project nears it's completion. The station, now retrofitted for police purposes now hails as [[Otaru Border Station]], and watches closer than the [[Battleship Matsumoto]] on the proceedings of [[DSE]]'s work to ensure the gate's swift completion.
 
 
==Missions Offered==
 
==Missions Offered==
 
* N/A
 
* N/A
 +
 
==Bribes Offered==
 
==Bribes Offered==
 
{{Spoiler|
 
{{Spoiler|
 
* N/A
 
* N/A
 
}}
 
}}
 +
{{Clear}}
 +
 
==Commodities==
 
==Commodities==
 
{{Exports|
 
{{Exports|
Line 30: Line 34:
 
}}{{Imports|
 
}}{{Imports|
 
* N/A
 
* N/A
}}{{Clear}}
+
}}
 +
{{Clear}}
  
 
[[Category: Kusari]]
 
[[Category: Kusari]]
 
[[Category: Deep Space Engineering]]
 
[[Category: Deep Space Engineering]]
 +
[[Category: Removed Bases]]

Latest revision as of 11:31, 13 January 2019

Error creating thumbnail: Unable to save thumbnail to destination
This page has been retired but kept for historical or other reasons, The information on this page may be incorrect, out of date or just not relevant to this version of Discovery. It should not be taken as canon nor any authority on the current version of Discovery. It is kept simply to show some history of the Discovery Mod:
This is a station that last existed in version 4.85.2 of the Discovery Freelancer mod and has now been renamed to Otaru Border Station under a new faction. Below is a history of the station under DSE and the proceedings that occured from the beginning of the construction to the present day.

See also:

What Links HerePage HistoryHistorical Articles


Chugoku Gate Construction Site
Station
Chugoku Gate Construction Site.jpg
Owner
DseLogo.png Deep Space Engineering
Location
3D, Hokkaido
Technical Data
Gravity unknown
Docking bays unknown
Amenities unknown
Crew unknown

In 798 A.S., construction was started on the Jump Gate leading to the Chugoku system, with most of the workers coming from Deep Space Engineering. Officially, the Kusari government stated that the Chugoku system holds a considerable amount of mineral wealth that would benefit thous house economy.

The jump gate construction project and the Trade Lanes leading to it were originally supposed to have been completed in 803 A.S., but due to the actions of the Blood Dragons and their allies, the project has been frequently disrupted and stalled and work is still being carried out. Samura Industries stated the gate's estimated completion date would be 820 A.S. by the latest, but others remain sceptical as to how much the project may cost as well as how long it will take.

The station that was originally designated as the Chugoku Gate Construction Site was a supply depot for the work being carried out on the gate. But has since been handed over the Kusari State Police to provide further security to the project due to increased Blood Dragon activities as the project nears it's completion. The station, now retrofitted for Police purposes now hails as Otaru Border Station, and watches closer than the Battleship Matsumoto on the proceedings of DSE's work to ensure the gate's swift completion.

Missions Offered

  • N/A

Bribes Offered


Commodities

Exports
  • N/A
Imports
  • N/A