This wiki is closed in favour of the new wiki. Information shown is likely to be very out of date. |
Difference between revisions of "Haute-Seine Shipyard"
(Exports, most important Imports & Ships added) |
m (New Location in Picardy. New Infocard & links added. (Version 4.91) |
||
Line 7: | Line 7: | ||
| type = SHIPYARD | | type = SHIPYARD | ||
| system = [[Picardy]] | | system = [[Picardy]] | ||
− | | sector = | + | | sector = 4F |
| house = {{House Link | Gallia}} | | house = {{House Link | Gallia}} | ||
| owner = [[EFL Oil & Machinery]] | | owner = [[EFL Oil & Machinery]] | ||
Line 15: | Line 15: | ||
| population = 870 | | population = 870 | ||
}} | }} | ||
− | Haute-Seine Shipyard was built in 578 | + | Haute-Seine Shipyard was built in 578 AGS by [[EFL Oil and Machinery]], on the site of a small depot that had shipped ice from the Doullens Ice Field. It was one of the first stations built in order to restore the economy of the Picardy system, and the government granted EFL huge subsidies and tax breaks in order to make the facility profitable. Moreover, because the [[GRN]] financed the [[Trade Lanes]] in [[Picardy]] for national defense reasons, the costs of shipping throughout the system to the shipyard were negligible to EFL. |
+ | |||
+ | EFL enjoyed these benefits for over a hundred years, when it was long evident that Picardy's space stations were in no way threatened by the Normandy separatists. Growing public outrage over this fact forced EFL to go through several troublesome corruption hearings in the Estates-General and funding was cancelled circa 680 AGS, but by that time Haute-Seine was already one of the largest facilities for producing civilian ships in [[Gallia]]. The Royal Navy had used the shipyard to construct supply ships and assemble hull components until its occupation by [[Council]] troops from the Battlegroup [[Battleship La Fierte|La Fierte]] in 741 AGS. The shipyard is now being employed by the Council to repair ships damaged in the invasion, though more of its facilities are being turned over to general fleet maintenance as those repairs are finalized. | ||
+ | |||
Revision as of 19:54, 23 November 2018
This article has not been verified to be up to date for the latest version of the Discovery mod. The last edit was made on 23.11.2018 (DD/MM/YYYY). You may help by updating it, often by using the code generator.
Haute-Seine Shipyard | |
Gaiana class Shipyard | |
Owner | |
EFL Oil & Machinery | |
Location | |
4F, Picardy | |
Technical Data | |
Gravity | Complete |
Docking bays | Yes |
Amenities | Yes |
Crew | 870 |
Haute-Seine Shipyard was built in 578 AGS by EFL Oil and Machinery, on the site of a small depot that had shipped ice from the Doullens Ice Field. It was one of the first stations built in order to restore the economy of the Picardy system, and the government granted EFL huge subsidies and tax breaks in order to make the facility profitable. Moreover, because the GRN financed the Trade Lanes in Picardy for national defense reasons, the costs of shipping throughout the system to the shipyard were negligible to EFL.
EFL enjoyed these benefits for over a hundred years, when it was long evident that Picardy's space stations were in no way threatened by the Normandy separatists. Growing public outrage over this fact forced EFL to go through several troublesome corruption hearings in the Estates-General and funding was cancelled circa 680 AGS, but by that time Haute-Seine was already one of the largest facilities for producing civilian ships in Gallia. The Royal Navy had used the shipyard to construct supply ships and assemble hull components until its occupation by Council troops from the Battlegroup La Fierte in 741 AGS. The shipyard is now being employed by the Council to repair ships damaged in the invasion, though more of its facilities are being turned over to general fleet maintenance as those repairs are finalized.
Missions Offered
Spoiler: |
---|
|
Bribes Offered
Spoiler: |
---|
|
Commodities
Exports |
Imports |
Imports |
Ships
|