05-05-2015, 03:39 PM
To whom it may concern;
I'm Magdalena Atzenbruck, president of ALG Waste Disposal.
Our continuing efforts to clear the Southampton debris field have reached a point which necessitates a base of operations of our own, with the shipyard being under high workload already and Trafalgar simply not possessing the necessary docking and storage capacity.
ALG Waste Disposal's financial advisory team has assessed the feasibility of constructing a new installation within the debris field and has concluded that the endeavor is doable.
The planned location lies at the edge of the field, and would form a triangle with Trafalgar and Southampton, being around 13k south of the former, and 16k west of the latter. If necessary, a recording of the location is available.
The installation would be fully owned and operated by ALG Waste Disposal. The primary function would obviously be as a staging point for scrappers, and a storage facility for recovered scrap.
The planned name for the installation would be Danzig Depot.
The 50 000 000 deposit has been transferred from the [ALG]-Bank. The remaining registration fee of 300 000 000 credits will be transferred if the project gains preliminary approval.
<file01>
Thank you for your time.