05-01-2020, 01:06 PM
Incoming Transmission from Scarborough Station, Newcastle
To: BPAPriority: High
Topic: Modular Base
Message Contents:
Good morning. Borderworld Exports are looking to create a modular base in the Cambridge system, named Andover Station, and require approval for us to do so. We had previously sent a transmission however this was not through the proper channels. I have forwarded the message now that we have been directed to the correct place. The message reads:
Quote:Good morning representatives. My name is Peter Hudson and I am here contacting you on behalf of Borderworld Exports about the construction of a new modular base. A Bretonian Mining and Manufacturing employee has been in contact with me about Bowex aiding BMM with the construction of the new shipyard in Cambridge. I have been in contact with the Bowex Directors and a unanimous decision was made fairly quickly. We'd like to offer our services in the construction of this new shipyard by providing a new platform to help speed up the production of the shipyard.
This new platform, or modular base, we want to erect will be situated near the Construction Ship Fenland so that we can provide another base of operations, security and a means to deliver more cargo and people to aid with the construction of the shipyard. Bowex and BMM have been on great terms for a very long time so it would mean a lot for us to help out, especially post-war.
A deposit has been wired to the appropriate account. Thank you for your consideration.
Peter Hudson
Supervisor, Trade
Borderworld Exports
Supervisor, Trade
Borderworld Exports
Transmission End